Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation (Text with EEA relevance)
EU Regulation 2017/1485 · Adopted 2 August 2017 · Extends to United Kingdom
Commission Regulation (EU) 2017/1485
of 2 August 2017
establishing a guideline on electricity transmission system operation
(Text with EEA relevance)
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EC) No 714/2009 of the European Parliament and of the Council of 13 July 2009 on conditions for access to the network for cross-border exchanges in electricity and repealing Regulation (EC) No 1228/2003f1, and in particular Article 18(3)(d) and Article 18(5) thereof,
Whereas:
(1)
A fully functioning and interconnected internal energy market is crucial for maintaining security of energy supply, increasing competitiveness and ensuring that all consumers can purchase energy at affordable prices.
(2)
Regulation (EC) No 714/2009 sets out non-discriminatory rules governing access to the network for cross-border exchanges in electricity with a view to ensuring the proper functioning of the internal market in electricity.
(3)
Harmonised rules on system operation for transmission system operators (‘TSOs’), distribution system operators (‘DSOs’) and significant grid users (‘SGUs’) should be set out in order to provide a clear legal framework for system operation, facilitate Union-wide trade in electricity, ensure system security, ensure the availability and exchange of necessary data and information between TSOs and between TSOs and all other stakeholders, facilitate the integration of renewable energy sources, allow more efficient use of the network and increase competition for the benefit of consumers.
(4)
To ensure the operational security of the interconnected transmission system, it is essential to define a common set of minimum requirements for Union-wide system operation, for the cross-border cooperation between the TSOs and for utilising the relevant characteristics of the connected DSOs and SGUs.
(5)
All TSOs should comply with the common minimum requirements on procedures necessary to prepare real-time operation, to develop individual and deliver common grid models, to facilitate the efficient and coordinated use of remedial actions which are necessary for real-time operation in order to maintain the operational security, quality and stability of the interconnected transmission system, and to support the efficient functioning of the European internal electricity market and facilitate the integration of renewable energy sources (‘RES’).
(6)
While there are currently a number of voluntary regional cooperation initiatives in system operations promoted by TSOs, formalised coordination between TSOs is necessary for operating the Union transmission system in order to address the transformation of the Union electricity market. The rules for system operation provided for in this Regulation require an institutional framework for enhanced coordination between TSOs, including the mandatory participation of TSOs in regional security coordinators (‘RSCs’). The common requirements for the establishment of RSCs and for their tasks set out in this Regulation constitute a first step towards further regional coordination and integration of system operation and should facilitate the achievement of the aims of Regulation (EC) No 714/2009 and ensure higher security of supply standards in the Union.
(7)
This Regulation should set out a framework for the mandated cooperation of TSOs via the appointment of RSCs. RSCs should issue recommendations to the TSOs of the capacity calculation region for which it is appointed. TSOs should, individually, decide whether to follow or not the recommendations of the RSC. The TSO should remain responsible for maintaining operational security of its control area.
(8)
Rules on operational training and certification are required in order to guarantee that system operator employees and other operational staff are skilled and well trained and that the system operator employees in real-time operation are certified to operate the transmission system in a secure way during all operational situations. The rules on training and certification strengthen and formalise existing best practices amongst TSOs and ensure that minimum standards are applied by all TSOs in the Union.
(9)
Operational testing and monitoring requirements aim at ensuring the correct functioning of the elements of the transmission system, the distribution system and of the grid users' equipment. Planning for and the coordination of operational tests are necessary to minimise disruptions in the stability, operation and economic efficiency of the interconnected system.
(10)
In view that planned outages impact grid stability also outside of a TSO's control area, each TSO should, within the scope of operational planning, monitor the feasibility of planned outages for each time-frame and where necessary, coordinate outages with and between TSOs, DSOs and SGUs when those outages have an impact on cross-border flows affecting the operational security of the transmission systems.
(11)
The operational and scheduling processes required to anticipate real-time operational security difficulties and develop relevant remedial measures involve timely and adequate data exchange. Therefore, such exchange should not be hampered by any barriers between the different actors involved.
(12)
One of the most critical processes in ensuring operational security with a high level of reliability and quality is the load-frequency control (‘LFC’). Effective LFC can be made possible only if there is an obligation for the TSOs and the reserve connecting DSOs to cooperate for the operation of the interconnected transmission systems as one entity and for providers' power generating modules and providers' demand facilities to meet the relevant minimum technical requirements.
(13)
The provisions on LFC and reserves, aim at setting out clear, objective and harmonised requirements for TSOs, reserve connecting DSOs, providers' power generating modules and providers' demand facilities in order to ensure system security and to contribute to non-discrimination, effective competition and the efficient functioning of the internal electricity market. The provisions on LFC and reserves provide the technical framework necessary for the development of cross-border balancing markets.
(14)
In order to ensure the quality of the common system frequency, it is essential that a common set of minimum requirements and principles for Union-wide LFC and reserves are defined as a basis for both the cross-border cooperation between the TSOs and, where relevant, for utilising characteristics of the connected generation, consumption and distribution systems. To that end, this Regulation addresses the LFC structure and operational rules, the quality criteria and targets, the reserve dimensioning, the reserve exchange, sharing and distribution and the monitoring related to LFC.
(15)
Synchronous areas do not stop at the Union's borders and can include the territory of third countries. The Union, Member States and TSOs should aim for secure system operation inside all synchronous areas across the Union. They should support third countries in applying similar rules to those contained in this Regulation. ENTSO for Electricity should facilitate cooperation between Union TSOs and third country TSOs concerning secure system operation.
(16)
In accordance with Article 8 of Regulation (EC) No 713/2009 of the European Parliament and of the Councilf2, the Agency for the Cooperation of Energy Regulators (‘the Agency’) should take a decision if the competent regulatory authorities are not able to reach an agreement on common terms and conditions or methodologies.
(17)
This Regulation has been developed in close cooperation with the Agency, ENTSO for Electricity and stakeholders, in order to adopt effective, balanced and proportionate rules in a transparent and participative manner. In accordance with Article 18(3) of Regulation (EC) No 714/2009, the Commission will consult the Agency, ENTSO for Electricity and other relevant stakeholders before proposing any amendment to this Regulation.
(18)
The measures provided for in this Regulation are in accordance with the opinion of the Committee referred to in Article 23(1) of Regulation (EC) No 714/2009,
HAS ADOPTED THIS REGULATION:
Annotations to the whole text
Footnotes
- f1
- f2
-
Regulation (EC) No 713/2009 of the European Parliament and of the Council of 13 July 2009 establishing an Agency for the Cooperation of Energy Regulators (OJ L 211, 14.8.2009, p. 1).
Contents
- Part I: GENERAL PROVISIONS
- 1Subject matter
- 2Scope
- 3Definitions
- 4Objectives and regulatory aspects
- 5Terms and conditions or methodologies of TSOs
- 6Approval of terms and conditions or methodologies of TSOs
- 7Amendments to the terms and conditions or methodologies of TSOs
- 8Publication on internet
- 9Recovery of costs
- 10Stakeholder involvement
- 11Public consultation
- 12Confidentiality obligations
- 13Agreements with TSOs not bound by this Regulation Repealed
- 14Monitoring
- 15Annual report on operational security indicators
- 16Annual report on load-frequency control
- 17Annual report on regional coordination assessment Repealed
- Part II: OPERATIONAL SECURITY
- Title 1: OPERATIONAL SECURITY REQUIREMENTS
- Chapter 1: System states, remedial actions and operational security limits
- 18Classification of system states
- 19Monitoring and determination of system states by TSOs
- 20Remedial actions in system operation
- 21Principles and criteria applicable to remedial actions
- 22Categories of remedial actions
- 23Preparation, activation and coordination of remedial actions
- 24Availability of TSO's means, tools and facilities
- 25Operational security limits
- 26Security plan for critical infrastructure protection
- Chapter 2: Voltage control and reactive power management
- 27Obligations of all TSOs regarding voltage limits
- 28Obligations of SGUs concerning voltage control and reactive power management in system operation
- 29Obligations of all TSOs concerning voltage control and reactive power management in system operation
- Chapter 3: Short-circuit current management
- 30Short-circuit current
- 31Short-circuit current calculation and related measures
- Chapter 4: Power flow management
- 32Power flow limits
- Chapter 5: Contingency analysis and handling
- 33Contingency lists
- 34Contingency analysis
- 35Contingency handling
- Chapter 6: Protection
- 36General requirements on protection
- 37Special protection schemes
- 38Dynamic stability monitoring and assessment
- 39Dynamic stability management
- Title 2: DATA EXCHANGE
- Chapter 1: General requirements on data exchange
- 40Organisation, roles, responsibilities and quality of data exchange
- Chapter ...: ...
- 41Structural and forecast data exchange Repealed
- 42Real-time data exchange Repealed
- Chapter 3: Data exchange between TSOs and DSOs within the TSO's control area
- 43Structural data exchange
- 44Real-time data exchange
- Chapter 4: Data exchange between TSOs, owners of interconnectors or other lines and power generating modules connected to the transmission system
- 45Structural data exchange
- 46Scheduled data exchange
- 47Real-time data exchange
- Chapter 5: Data exchange between TSOs, DSOs and distribution-connected power generating modules
- 48Structural data exchange
- 49Scheduled data exchange
- 50Real-time data exchange
- 51Data exchange between TSOs and DSOs concerning significant power generating modules
- Chapter 6: Data exchange between TSOs and demand facilities
- 52Data exchange between TSOs and transmission-connected demand facilities
- 53Data exchange between TSOs and distribution-connected demand facilities or third parties participating in demand response
- Title 3: COMPLIANCE
- Chapter 1: Roles and responsibilities
- 54Responsibility of the SGUs
- 55Tasks of TSOs regarding system operation
- Chapter 2: Operational testing
- 56Purpose and responsibilities
- 57Performing operational tests and analysis
- Title 4: TRAINING
- 58Training program
- 59Training conditions
- 60Training coordinators and trainers
- 61Certification of system operator employees in charge of real-time operation
- 62Common language for communication between the system operator employees in charge of real time operation Repealed
- 63Cooperation between TSOs on training Repealed
- Part III: OPERATIONAL PLANNING
- Title 1: DATA FOR OPERATIONAL SECURITY ANALYSIS IN OPERATIONAL PLANNING
- 64General provisions regarding individual ... grid models
- 65Year-ahead scenarios
- 66Year-ahead individual grid models
- 67Year-ahead common grid models Repealed
- 68Updates of year-ahead individual ... grid models
- 69Week-ahead individual and common grid models Repealed
- 70Methodology for building day-ahead and intraday common grid models Repealed
- 71Quality control for grid models Repealed
- Title 2: OPERATIONAL SECURITY ANALYSIS
- 72Operational security analysis in operational planning
- 73Year-ahead ... operational security analysis
- 74Day-ahead, intraday and close to real-time operational security analysis
- 75Methodology for coordinating operational security analysis Repealed
- 76Proposal for regional operational security coordination Repealed
- 77Organisation for regional operational security coordination Repealed
- 78Regional operational security coordination Repealed
- 79Common grid model building Repealed
- 80Regional outage coordination Repealed
- 81Regional adequacy assessment Repealed
- Title 3: OUTAGE COORDINATION
- Chapter 1: Outage planning agents, relevant assets
- 82Outage coordination objective Repealed
- 83Regional coordination Repealed
- 84Methodology for assessing the relevance of assets for outage coordination Repealed
- 85Lists of relevant power generating modules and relevant demand facilities Repealed
- 86Update of the lists of relevant power generating modules and relevant demand facilities Repealed
- 87Lists of relevant grid elements Repealed
- 88Update of the list of relevant grid elements Repealed
- 89Appointment of outage planning agents
- 90Treatment of relevant assets located in a distribution system or in a closed distribution system
- Chapter 2: Development and update of availability plans of relevant assets
- 91Variations to deadlines for the year-ahead outage coordination
- 92General provisions on availability plans
- 93Long-term indicative availability plans
- 94Provision of year-ahead availability plan proposals
- 95Year-ahead coordination of the availability status of relevant assets for which the outage planning agent is not a TSO ..., nor a DSO or a CDSO
- 96Year-ahead coordination of the availability status of relevant assets for which the outage planning agent is a TSO ..., a DSO or a CDSO
- 97Provision of preliminary year-ahead availability plans
- 98Validation of year-ahead availability plans ...
- 99Final year-ahead availability plans
- 100Updates to the final year-ahead availability plans
- Chapter 3: Execution of availability plans
- 101Management of the ‘testing’ status of relevant assets
- 102Procedure for handling forced outages
- 103Real-time execution of the availability plans
- Title 4: ADEQUACY
- 104Forecast for control area adequacy analysis
- 105Control area adequacy analysis
- 106Control area adequacy ...
- 107Control area adequacy in day-ahead and intraday
- Title 5: ANCILLARY SERVICES
- 108Ancillary services
- 109Reactive power ancillary services
- Title 6: SCHEDULING
- 110Establishment of scheduling processes
- 111Notification of schedules within scheduling areas
- 112Coherence of schedules
- 113Provision of information to other TSOs Repealed
- Title ...: ...
- 114General provisions for ENTSO for Electricity operational planning data environment Repealed
- 115Individual grid models, common grid models and operational security analysis Repealed
- 116Outage coordination Repealed
- 117System adequacy Repealed
- Part IV: LOAD-FREQUENCY CONTROL AND RESERVES
- Title 1: OPERATIONAL AGREEMENTS
- 118Synchronous area operational agreements
- 119LFC block operational agreements
- 120LFC area operational agreement
- 121Monitoring area operational agreement
- 122Imbalance netting agreement Repealed
- 123Cross-border FRR activation agreement Repealed
- 124Cross-border RR activation agreement Repealed
- 125Sharing agreement Repealed
- 126Exchange agreement Repealed
- Title 2: FREQUENCY QUALITY
- 127Frequency quality defining and target parameters
- 128FRCE target parameters
- 129Criteria application process
- 130Frequency quality evaluation data
- 131Frequency quality evaluation criteria
- 132Data collection and delivery process
- 133Synchronous area monitor
- 134LFC block monitor
- 135Information on load and generation behaviour
- 136Ramping period within the synchronous area Repealed
- 137Ramping restrictions for active power output
- 138Mitigation
- Title 3: LOAD-FREQUENCY CONTROL STRUCTURE
- 139Basic structure
- 140Process activation structure
- 141Process responsibility structure
- 142Frequency containment process
- 143Frequency restoration process
- 144Reserve replacement process
- 145Automatic and manual frequency restoration process
- 146Imbalance netting process Repealed
- 147Cross-border FRR activation process Repealed
- 148Cross-border RR activation process Repealed
- 149General requirements for cross-border control processes Repealed
- 150TSO notification Repealed
- 151Infrastructure
- Title 4: OPERATION OF LOAD-FREQUENCY CONTROL
- 152System states related to system frequency
- Title 5: FREQUENCY CONTAINMENT RESERVES
- 153FCR dimensioning
- 154FCR technical minimum requirements
- 155FCR prequalification process
- 156FCR provision
- Title 6: FREQUENCY RESTORATION RESERVES
- 157FRR dimensioning
- 158FRR minimum technical requirements
- 159FRR prequalification process
- Title 7: REPLACEMENT RESERVES
- 160RR dimensioning
- 161RR minimum technical requirements
- 162RR prequalification process
- Title 8: EXCHANGE AND SHARING OF RESERVES
- Chapter 1: Exchange and sharing of reserves within a synchronous area
- 163Exchange of FCR within a synchronous area
- 164Sharing of FCR within a synchronous area
- 165General requirements for the exchange of FRR and RR within a synchronous area
- 166General requirements for sharing FRR and RR within a synchronous area
- 167Exchange of FRR within a synchronous area Repealed
- 168Sharing of FRR within a synchronous area Repealed
- 169Exchange of RR within a synchronous area Repealed
- 170Sharing of RR within a synchronous area Repealed
- Chapter 2: Exchange and sharing of reserves between synchronous areas
- 171General requirements
- 172Frequency coupling between synchronous areas Repealed
- 173Exchange of FCR between synchronous areas Repealed
- 174Sharing of FCR between synchronous areas Repealed
- 175General requirements for sharing of FRR and RR between synchronous areas Repealed
- 176Exchange of FRR between synchronous areas Repealed
- 177Sharing of FRR between synchronous areas Repealed
- 178Exchange of RR between synchronous areas Repealed
- 179Sharing of RR between synchronous areas Repealed
- Chapter ...: ...
- 180Cross-border activation process for FRR/RR Repealed
- Title 9: TIME CONTROL PROCESS
- 181Time control process
- Title 10: COOPERATION WITH DSOS
- 182Reserve providing groups or units connected to the DSO grid
- Title 11: TRANSPARENCY OF INFORMATION
- 183General transparency requirements
- 184Information on operational agreements
- 185Information on frequency quality
- 186Information on the load-frequency control structure
- 187Information on FCR
- 188Information on FRR
- 189Information on RR
- 190Information on sharing and exchange
- Part V: FINAL PROVISIONS
- 191Amendments to contracts and general terms and conditions
- 192Entry into force
- Signature
- Annex IAnnex I Repealed
- Annex IIAnnex II
- Annex IIIAnnex III
- Annex IVAnnex IV
- Annex VAnnex V
- Annex VIAnnex VI
- Annex VIIAnnex VII Repealed
- Annex VIIIAnnex VIII Repealed