Article 135 Information on load and generation behaviour
United Kingdom
In accordance with Article 40, each connecting TSO shall have the right to request the information necessary from SGUs to monitor the load and generation behaviour related to imbalances. That information may include:
- (a)
the time-stamped active power setpoint for real-time and future operation; and
- (b)
the time-stamped total active power output.