OpenLegislation

Article 138 Mitigation

United Kingdom

Original text. Later amendments are not shown.

Where the values calculated for the period of one calendar year concerning the frequency quality target parameters or the FRCE target parameters are outside the targets set for F1the GB synchronous area or for the LFC block, all TSOs of F2the GB synchronous area or of the relevant LFC block shall:

  1. (a)

    analyse whether the frequency quality target parameters or the FRCE target parameters will remain outside the targets set for the GB synchronous area or for the LFC block and in case of a justified risk that this may happen, analyse the causes and develop recommendations; and

  2. (b)

    develop mitigation measures to ensure that the targets for the GB synchronous area or for the LFC block can be met in the future.

Annotations

Textual amendments

F1

Words in Art. 138 substituted (E.W.S.) (31.12.2020) by The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 88(3) (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)

F2

Words in Art. 138 substituted (E.W.S.) (31.12.2020) by The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 88(2) (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)