Article 5 Terms and conditions or methodologies of TSOs

United Kingdom

Original text. Later amendments are not shown.

1.

TSOs shall develop the terms and conditions or methodologies required by this Regulation and submit them for approval to F1the regulatory authority in accordance with Article 6(3) and (4) within the respective deadlines set out in this Regulation.

2.

Where a proposal for terms and conditions or methodologies pursuant to this Regulation needs to be developed and agreed by more than one TSO, the participating TSOs shall closely cooperate. F2TSOs shall regularly inform the regulatory authority about the progress of developing those terms and conditions or methodologies.

F33.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9.

Where TSOs fail to submit a proposal for terms and conditions or methodologies F4to the regulatory authority in accordance with Article 6(3) and (4) within the deadlines specified in this Regulation, they shall provide the regulatory authority with the relevant drafts of the terms and conditions or methodologies, and explain why an agreement has not been reached. F5... The F6regulatory authority shall take the appropriate steps to make possible the adoption of the required terms and conditions or methodologies within 4 months from the receipt of F7the relevant drafts.

Annotations

Textual amendments

F1

Words in Art. 5(1) substituted (E.W.S.) (31.12.2020) by The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 6(2) (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)

F2

Words in Art. 5(2) substituted (E.W.S.) (31.12.2020) by The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 6(3) (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)

F3

Art. 5(3)-(8) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 6(4) (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)

F4

Words in Art. 5(9) substituted (E.W.S.) (31.12.2020) by The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 6(5)(a) (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)

F5

Words in Art. 5(9) omitted (E.W.S.) (31.12.2020) by virtue of The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 6(5)(b) (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)

F6

Words in Art. 5(9) substituted (E.W.S.) (31.12.2020) by The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 6(5)(c)(i) (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)

F7

Words in Art. 5(9) substituted (E.W.S.) (31.12.2020) by The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 6(5)(c)(ii) (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)