Article 97 Provision of preliminary year-ahead availability plans

United Kingdom

Original text. Later amendments are not shown.

1.

Before 1 November of each calendar year, each TSO shall provide to all other TSOs F1of the GB synchronous area the preliminary year-ahead availability plans for the following calendar year for all the internal relevant assets.

2.

Before 1 November of each calendar year, for each internal relevant asset located in a distribution system, the TSO shall provide the DSO with the preliminary year-ahead availability plan.

3.

Before 1 November of each calendar year, for every internal relevant asset located in a closed distribution system, the TSO shall provide the CDSO with the preliminary year-ahead availability plan.

Annotations

Textual amendments

F1

Words in Art. 97(1) substituted (E.W.S.) (31.12.2020) by virtue of The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/533), reg. 1(2), Sch. 1 para. 63 (as amended by S.I. 2020/1016, regs. 1(2), 6(2)); 2020 c. 1, Sch. 5 para. 1(1)