Division 3.6.4
United Kingdom
The misalignment calibration test can be performed independently from the constant speed test procedure. If the misalignment calibration test is performed separately it shall be executed as follows:
- i..
Prepare the opto-electronic barriers at the 250 m ± 3 m section, or check the proper function of the DGPS System.
- ii..
Check the vehicle setup regarding the height and geometry in accordance with 3.5.3.1 of this Annex. Adjust the height of the semi-trailer to the requirements as specified in appendix 4 to this Annex if necessary
- iii..
No prescriptions for warm-up are applicable
- iv.
Perform the misalignment calibration test by at least 5 valid passings as described above.