Division 7.3.1 Pre-test procedures
United Kingdom
Original text. Later amendments are not shown.
- 7.3.1.1General requirements for preconditioning the sampling system and the engine
- 7.3.1.2Engine cool-down (NRTC)
- 7.3.1.3Verification of HC contamination
- 7.3.1.4Preparation of measurement equipment for sampling
- 7.3.1.5Calibration of gas analyzers
- 7.3.1.6PM filter preconditioning and tare weighing