Division 7.3.1.4 Preparation of measurement equipment for samplingF1
United Kingdom
The following steps shall be taken before emission sampling begins:
- (a)
Leak checks shall be performed within 8 hours prior to emission sampling in accordance with point 8.1.8.7;
- (b)
For batch sampling, clean storage media shall be connected, such as evacuated bags or tare-weighed filters;
- (c)
All measurement instruments shall be started in accordance with the instrument manufacturer's instructions and good engineering judgment;
- (d)
Dilution systems, sample pumps, cooling fans, and the data-collection system shall be started;
- (e)
The sample flow rates shall be adjusted to desired levels, using bypass flow, if desired;
- (f)
Heat exchangers in the sampling system shall be pre-heated or pre-cooled to within their operating temperature ranges for a test;
- (g)
Heated or cooled components such as sample lines, filters, chillers, and pumps shall be allowed to stabilize at their operating temperatures;
- (h)
Exhaust gas dilution system flow shall be switched on at least 10 minutes before a test sequence;
- (i)
Calibration of gas analyzers and zeroing of continuous analyzers shall be carried out in accordance with the procedure of point 7.3.1.5;
- (j)
Any electronic integrating devices shall be zeroed or re-zeroed, before the start of any test interval.