Division 7.3.1.1.1 Preconditioning for cold-start run of NRTC
United Kingdom
The engine shall be preconditioned by running at least one hot-start NRTC. Immediately after completing each preconditioning cycle, the engine shall be shut down and the engine-off hot-soak period shall be completed. Immediately after completing the last preconditioning cycle, the engine shall be shut down and the engine cool down described in point 7.3.1.2 shall be started.
Notes on Division 7.3.1.1
Textual amendments
- F1
- F2