Division 8.1.8.5.3 Preparation of the propane check
United Kingdom
The propane check shall be prepared as follows:
- (a)
If a reference mass of C3H8 is used instead of a reference flow rate, a cylinder charged with C3H8 shall be obtained. The reference cylinder's mass of C3H8 shall be determined within ± 0,5 % of the amount of C3H8 that is expected to be used;
- (b)
Appropriate flow rates shall be selected for the CVS and C3H8;
- (c)
A C3H8 injection port shall be selected in the CVS. The port location shall be selected to be as close as practical to the location where engine exhaust system is introduced into the CVS. The C3H8 cylinder shall be connected to the injection system;
- (d)
The CVS shall be operated and stabilized;
- (e)
Any heat exchangers in the sampling system shall be pre-heated or pre-cooled;
- (f)
Heated and cooled components such as sample lines, filters, chillers, and pumps shall be allowed to stabilize at operating temperature;
- (g)
If applicable, a vacuum side leak verification of the HC sampling system shall be performed as described in point 8.1.8.7.