Division 4.4.4 Procedure
United Kingdom
Original text. Later amendments are not shown.
- 4.4.4.1Preparation of booster charge for insertion into steel tube
- 4.4.4.2Preparing steel tubes for the detonation tests
- 4.4.4.3Filling and charging the steel tube
- 4.4.4.4Positioning of the steel tube and lead cylinders (see Figure 4)
- 4.4.4.5Preparation for detonation