Division 4.4.4.4 Positioning of the steel tube and lead cylinders (see Figure 4)
United Kingdom
- 4.4.4.4.1Division 4.4.4.4.1
- 4.4.4.4.2Lay the steel tube prepared according to point 4.4.4.3 horizontally on the lead cylinders so that the axis of the tube is parallel to the centre line of the lead cylinders and the welded end of the tube extends 50 mm beyond lead cylinder No 6. To prevent the tube from rolling, insert small wooden or plastic wedges between the tops of the lead cylinders and the tube wall (one on each side) or place a cross of wood between the tube and the steel block or stack of beams. (see Figure 4).