Regulation 48 Requirements which must be satisfied before an importer places a civil explosive on the marketF1
Before placing a civil explosive on the market, an importer must ensure that—
a relevant conformity assessment procedure has been carried out by the manufacturer;
the manufacturer has drawn up the technical documentation;
the manufacturer has complied with the requirements, where applicable, set out in regulation 44 (traceability of certain civil explosives excluded from the scope of regulations 33, 34 and 36) to the extent not already covered by sub-paragraph (c)(ii).
In paragraph (1)(c)(ii), “required documents” means any documents that are required to be provided with the civil explosive pursuant to—
regulation 44(2) and (3); and
regulation 45.
Annotations
Textual amendments
- F1
Pt. 13 (regs. 39-77) substituted for Pt. 13 (regs. 39-42) (and therefore original regs. 43, 44 renumbered as new regs. 78, 79, new reg. 80 substituted for original reg. 45 and original regs. 46-49 renumbered as new regs. 81-84) (20.4.2016) by The Explosives Regulations 2014 (Amendment) Regulations 2016 (S.I. 2016/315), regs. 1, 7, 8, 9 (with regs. 2(1), 15)
- F2
Word in reg. 48(1)(c)(i) substituted (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 16 para. 13 (with Sch. 16 para. 29) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)