Regulation 56 Requirements which must be satisfied before a distributor makes a civil explosive available on the marketF1
Before making a civil explosive available on the market, the distributor must verify that—
the manufacturer has complied with the requirements, where applicable, set out in regulation 44 (traceability of certain civil explosives excluded from the scope of regulations 33, 34 and 36) to the extent not already covered by sub-paragraph (a)(ii); and
the importer has complied with the requirements set out in regulation 50 (information identifying importer) to the extent not already covered by sub-paragraph (a)(ii).
In paragraph (1)(a)(ii), “required documents” means the documents that are required to be provided with the civil explosive pursuant to—
regulation 44(2) and (3); and
regulation 50(3).
Annotations
Textual amendments
- F1
Pt. 13 (regs. 39-77) substituted for Pt. 13 (regs. 39-42) (and therefore original regs. 43, 44 renumbered as new regs. 78, 79, new reg. 80 substituted for original reg. 45 and original regs. 46-49 renumbered as new regs. 81-84) (20.4.2016) by The Explosives Regulations 2014 (Amendment) Regulations 2016 (S.I. 2016/315), regs. 1, 7, 8, 9 (with regs. 2(1), 15)
- F2
Word in reg. 56(1)(a)(i) substituted (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 16 para. 19(a) (with Sch. 16 para. 29) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
- F3
Reg. 56(1)(a)(iii) substituted (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 16 para. 19(b) (with Sch. 16 para. 29) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)