OpenLegislation

Paragraph 4 Eligible scheme actions; farmland tree plantingF1

Northern Ireland

(1)

An applicant planting trees must–

(a)

not plant trees–

(i)

on land within 5 metres of a designated watercourse;

(ii)

on flood defence areas;

(iii)

on riparian buffer strips;

(iv)

within hedgerows; or

(v)

on permanent grassland sensitive areas;

(b)

plant three or more native tree species listed in Schedule 5;

(c)

ensure a minimum of 0.05 hectares are planted at 2.5 metre spacing in the same plot at a planting rate of 1,600 trees per hectare;

(d)

support and protect each newly planted tree from damage by grazing livestock or wildlife on all sides;

(e)

exclude livestock from the area in which the new trees are planted;

(f)

manage and maintain trees planted including the removal of grass or weeds negatively impacting tree growth;

(g)

ensure that access to watercourses for maintenance purposes is unobstructed;

(h)

retain evidence, as the Department may specify, of the quantity and native tree species used;

(i)

complete all work related to this action by 28th February 2027;

(j)

retain planted trees for a minimum period of 20 years beginning with 28th February 2027; and

(k)

ensure if erecting protective fencing it meets the eligibility criteria in Schedule 2.

Annotations

Textual amendments

F1

Sch. 1 para. 4 substituted (25.6.2026) by The Farming with Nature Scheme (Amendment) Regulations (Northern Ireland) 2026 (S.R. 2026/105), regs. 1(1), 2(7)(c)