Article 3 Article 9 (preliminary accreditation)
In article 9 (preliminary accreditation)—
for paragraph (1), substitute—
“(1)This article applies where a person (“the prospective FIT generator”)—
(a)proposes to construct or operate an eligible installation (other than an extension) which, when commissioned, will—
(i)use anaerobic digestion;
(ii)be a hydro generating station; or
(iii)be a wind or solar photovoltaic installation, and have a declared net capacity of more than 50 kilowatts; and
(b)makes an application in writing to the Authority for preliminary accreditation, which is received by the Authority on or before 30th September 2015.”; and
in paragraph (2), for “upon an application in writing by the prospective FIT generator,”, substitute “upon receiving the application referred to in paragraph (1)(b),”.