Paragraph 2 F1

In paragraph 1, “relevant installation standard” means—

(a)

if the commissioning date for the installation is on or after 15th January 2016, if the installation is—

(i)

a solar photovoltaic installation F2with a commissioning date on or before 11th March 2019, version 3.3 of the document entitled Microgeneration Installation Standard: MIS 3002 requirements for MCS contractors undertaking the supply, design, installation, set to work commissioning and handover of solar-photovoltaic (PV) microgeneration systems,

(F3ia)

a solar photovoltaic installation with a commissioning date on or after 12th March 2019, version 3.4 of the document entitled Microgeneration Installation Standard: MIS 3002 requirements for MCS contractors undertaking the supply, design, installation, set to work commissioning and handover of solar-photovoltaic (PV) microgeneration systems (published on 9th November 2018);

(ii)

a wind installation, version 3.4 of the document entitled Microgeneration Installation Standard: MIS 3003 requirements for MCS contractors undertaking the supply, design, installation, set to work commissioning and handover of micro and small wind turbine systems,

(iii)

a heat-led combined heat and power installation F4with a commissioning date on or before 11th March 2019, version 3.2 of the document entitled Microgeneration Installation Standard: MIS 3007 requirements for MCS contractors undertaking the design, supply, installation, set to work, commissioning and handover of a heating system containing and micro-cogeneration package; F5...

(F6iiia)

a heat-led combined heat and power installation with a commissioning date on or after 12th March 2019, version 3.3 of the document entitled Microgeneration Installation Standard: MIS 3007 requirements for MCS contractors undertaking the design, supply, installation, set to work, commissioning and handover of a heating system containing a micro-cogeneration package or add-on units (published on 12th November 2018);

(iv)

an electricity-led combined heat and power installation F7with a commissioning date on or before 11th March 2019, version 2.3 of the document entitled Microgeneration Installation Standard: MIS 3007-2 requirements for MCS contractors undertaking the design, supply, installation, set to work, commissioning and handover of a domestic hot water system combining an electricity led micro-cogeneration package; or

(F8iva)

an electricity-led combined heat and power installation with a commissioning date on or after 12th March 2019, version 2.4 of the document entitled Microgeneration Installation Standard: MIS 3007-2 requirements for MCS contractors undertaking the design, supply, installation, set to work, commissioning and handover of a heating system containing an electricity-led micro-cogeneration package or add-on unit(s) (published on 12th November 2018); or

(b)

if the commissioning date for the installation is before the 15th January 2016, any installation requirements applicable to the installation under the MCS on the installation’s commissioning date.

Annotations

Textual amendments

F1

Sch. A1 inserted (15.1.2016) by The Feed-in Tariffs (Amendment) (No. 3) Order 2015 (S.I. 2015/2045), arts. 1, 21, Sch. 1 (with art. 24)

F2

Words in Sch. A1 para. 2(a)(i) inserted (1.2.2019) by The Feed-in Tariffs (Closure, etc.) Order 2018 (S.I. 2018/1380), arts. 1, 16(2)(a)

F3

Sch. A1 para. 2(a)(ia) inserted (1.2.2019) by The Feed-in Tariffs (Closure, etc.) Order 2018 (S.I. 2018/1380), arts. 1, 16(2)(b)

F4

Words in Sch. A1 para. 2(a)(iii) inserted (1.2.2019) by The Feed-in Tariffs (Closure, etc.) Order 2018 (S.I. 2018/1380), arts. 1, 16(2)(c)

F5

Words in Sch. A1 para. 2(a)(iii) omitted (1.2.2019) by The Feed-in Tariffs (Closure, etc.) Order 2018 (S.I. 2018/1380), arts. 1, 16(2)(d)

F6

Sch. A1 para. 2(a)(iiia) inserted (1.2.2019) by The Feed-in Tariffs (Closure, etc.) Order 2018 (S.I. 2018/1380), arts. 1, 16(2)(e)

F7

Words in Sch. A1 para. 2(a)(iv) inserted (1.2.2019) by The Feed-in Tariffs (Closure, etc.) Order 2018 (S.I. 2018/1380), arts. 1, 16(2)(f)

F8

Sch. A1 para. 2(a)(iva) inserted (1.2.2019) by The Feed-in Tariffs (Closure, etc.) Order 2018 (S.I. 2018/1380), arts. 1, 16(2)(g)