OpenLegislation

Paragraph 12 I1

(1)

The total length of the cables in Work Nos. 2, 2A and 3, and the volume of their cable protection (including cable crossings) must not exceed the following—

WorkLengthCable protection
Work Nos. 2, 2A and 3196 kilometres

321,600 square metres

187,600 cubic metres

(2)

Within 1600 metres seawards of MHWS, cable protection measures and cable protection remediation carried out as part of the must not include any use of loose rock or gravel.

Annotations

Commencement

I1

Sch. 11 para. 12 in force at 8.1.2026, see art. 1