Paragraph 3 I1
Such activities described in paragraph 2 are authorised in relation to the construction, maintenance and operation of—
Work No. 2— Electrical export works comprising—
up to two offshore substation platforms each fixed to the seabed by a foundation;
up to two subsea cable circuits between the offshore platforms forming Work No. 2(a) including cable crossings and cable protection; and
up to two subsea cable circuits between Work No. 2(a) and Work No. 3, cable protection and cable crossings.
Work No. 2A— Sheet piling works and creation of pits for trenchless installation techniques, including installation of up to two cable ducts, installation and use of temporary construction working areas, cable installation vessel anchoring and works to allow vessels to remain in place at low tide.
Work No. 3— Installation of up to two subsea cable circuits between Work No. 2 and Work No. 4, including up to two cable ducts, cable protection and cable crossings and further including—
sheet piling works including creation of pits for trenchless installation techniques, trenchless installation technique works including the creation of entrance and exit pits; and
installation and use of temporary construction working areas, cable installation vessel anchoring, works to allow vessels to remain in place at low tide and laydown area.
In connection with such Work Nos. 2, 2A and 3 and to the extent that they do not otherwise form part of any such work, further associated development within the meaning of section 115(2) (development for which development consent may be granted) of the 2008 Act comprising such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised development and which fall within the scope of the work assessed by the environmental statement and the provisions of this licence, including—
scour protection around the foundations of the offshore electrical installations;
cable protection measures such as the placement of rock and/or concrete mattresses;
the removal of material from the seabed required for the construction of Work Nos. 2 and 3; and
temporary landing places, moorings or other means of accommodating or anchoring vessels in the construction and/or maintenance of the authorised development.
Annotations
Commencement
- I1
Sch. 11 para. 3 in force at 8.1.2026, see art. 1