The noise rating level for the standard operation of Work No. 15B (the onshore electrical substation) must not exceed—

(a)

32 decibel LAr,Tr at any time at a free field location immediately adjacent to the following noise sensitive locations—

(i)

Waterhouse Farm (Grid reference 607256 228374);

(ii)

Lilleys Farm (Grid reference 607731 227827); and

(b)

31 decibel LAr,Tr at any time at a free field location immediately adjacent to Normans Farm (Grid reference 608446 228492).

(2)

Prior to commencement of operation of Work No. 15B, a noise investigation protocol must be submitted to and approved by the discharging authority. The protocol must set out a process for the investigation of cumulative operational noise from the proposed National Grid substation and the proposed North Falls substation as and when one or both is operational.

(3)

The determination of LAr,Tr must be in accordance with BS 4142:2014+A1:2019. The reference method set out in Annex D to BS 4142:2014+A1:2019 (or any successor thereto) must be used in the assessment of whether tonal penalties apply. The noise investigation protocol must identify—

(a)

the required meteorological and other conditions under which the measurements will be taken, acknowledging that data obtained during emergency operation or testing of certain plant and equipment is not to be taken into account, and

(b)

suitable monitoring locations (and alternative locations if appropriate).

(4)

Within 12 months of commencement of operation of Work No. 15B, the undertaker must carry out noise evaluations at the noise sensitive locations listed in sub-paragraphs (1)(a) and (1)(b) and submit the results to the F1discharging authority. If the noise rating levels are found to be exceeded, the undertaker must provide details of further noise monitoring and mitigation to be agreed in writing by the discharging authority.

(5)

For the purposes of this requirement “standard operation” means the ordinary operation of the substations excluding emergency operation and the testing of plant and equipment associated with emergency operation.

Annotations

Textual amendments

F1

Words in Sch. 2 Pt. 1 para. 15(4) substituted (6.10.2026) by The Five Estuaries Offshore Wind Farm (Correction) Order 2026 (S.I. 2026/1070), art. 1, Sch.

Commencement

I1

Sch. 2 Pt. 1 para. 15 in force at 8.1.2026, see art. 1