OpenLegislation

Regulation 12 Objections

Scotland

(1)

Any objection to a proposed F1scheme or a modified scheme under paragraph 3 of schedule 2 to the Act must be accompanied by a statement of the reasons for the objection.

(2)

Where an objector under paragraph 3 of schedule 2 to the Act has an interest in any land on which the F2scheme operations are to be carried out or which may be affected by any of the scheme operations, or by any alteration in the flow of water caused by any of F3the scheme operations, that person's objection must include—

(a)

details of the land in which the objector has an interest;

(b)

disclosure of the nature of the objector's interest in the land; and

(c)

details of which aspects of the scheme operations affect the objector.

Annotations

Textual amendments

F1

Words in reg. 12(1) substituted (16.5.2017) by The Flood Risk Management (Flood Protection Schemes, Potentially Vulnerable Areas and Local Plan Districts) (Scotland) Amendment Regulations 2017 (S.S.I. 2017/112), regs. 1(1), 4(3)(a) (with reg. 7)

F2

Word in reg. 12(2) substituted (16.5.2017) by The Flood Risk Management (Flood Protection Schemes, Potentially Vulnerable Areas and Local Plan Districts) (Scotland) Amendment Regulations 2017 (S.S.I. 2017/112), regs. 1(1), 4(3)(b)(i) (with reg. 7)

F3

Words in reg. 12(2) substituted (16.5.2017) by The Flood Risk Management (Flood Protection Schemes, Potentially Vulnerable Areas and Local Plan Districts) (Scotland) Amendment Regulations 2017 (S.S.I. 2017/112), regs. 1(1), 4(3)(b)(ii) (with reg. 7)