Schedule 1 SELECTION CRITERIAF1 1Characteristics of scheme 2Location of scheme 3Characteristics of the potential impact 4Interpretation of schedule 1 Annotations Textual amendments F1 Sch. 1 substituted (16.5.2017) by The Flood Risk Management (Flood Protection Schemes, Potentially Vulnerable Areas and Local Plan Districts) (Scotland) Amendment Regulations 2017 (S.S.I. 2017/112), reg. 1(1), sch. 1 (with reg. 7) ← Signature Schedule 1 Paragraph 1 →