Article 4
For the purposes of subsection (2) of section 6, the Director may determine as the relevant date a date which is—
(a)
not earlier than 1st April 1998;
(b)
after the date determined by him in respect of the area specified in Part V of the Schedule;
(c)
at least four months after the Director’s proposal to determine a date for the purposes of that subsection is notified under article 5 below; and
(d)
at least two months after the date on which his determination is made.