Regulation 4
The following Schedule shall be substituted for Schedule 1 to the Principal Regulations—
“SCHEDULE 1
FEES
Regulation 5(1) and (10)
(1) (2) Meter Fee £ Prototype (not being a modified prototype) submitted for approval of its pattern and construction of—
- (a)
a diaphragm meter
450.00 (b)a rotary positive displacement meter
1050.00 (c)a turbine meter
1190.00 (d)any other kind of meter
1875.00 Modified prototype so submitted of—
- (a)
a diaphragm meter
90.00 (b)a rotary positive displacement meter
210.00 (c)a turbine meter
238.00 (d)any other kind of meter
375.00 Any meter (not being a prototype or modified prototype so submitted) with measuring capacity—
- (a)
not exceeding 13 cubic metres per hour
0.92 (b)exceeding 13 cubic metres per hour but not exceeding 19 cubic metres per hour
1.45 (c)exceeding 19 cubic metres per hour but not exceeding 53 cubic metres per hour
4.36 (d)exceeding 53 cubic metres per hour but not exceeding 228 cubic metres per hour
14.56 (e)exceeding 228 cubic metres per hour
36.41 Note
In this Schedule—
(a)“a modified prototype” means a prototype which, prior to modification, has already been examined by a meter examiner;
(b)“a rotary positive displacement meter” means a meter constructed so that it contains a rotating partition; and
(c)“a turbine meter” means a meter constructed so that it contains a turbine wheel.”