The following Schedule shall be substituted for Schedule 1 to the Principal Regulations—

“SCHEDULE 1

FEES

Regulation 5(1) and (10)

(1)(2)
MeterFee
£

Prototype (not being a modified prototype) submitted for approval of its pattern and construction of—

  1. (a)

    a diaphragm meter

450.00
(b)

a rotary positive displacement meter

1050.00
(c)

a turbine meter

1190.00
(d)

any other kind of meter

1875.00

Modified prototype so submitted of—

  1. (a)

    a diaphragm meter

90.00
(b)

a rotary positive displacement meter

210.00
(c)

a turbine meter

238.00
(d)

any other kind of meter

375.00

Any meter (not being a prototype or modified prototype so submitted) with measuring capacity—

  1. (a)

    not exceeding 13 cubic metres per hour

0.92
(b)

exceeding 13 cubic metres per hour but not exceeding 19 cubic metres per hour

1.45
(c)

exceeding 19 cubic metres per hour but not exceeding 53 cubic metres per hour

4.36
(d)

exceeding 53 cubic metres per hour but not exceeding 228 cubic metres per hour

14.56
(e)

exceeding 228 cubic metres per hour

36.41

Note

In this Schedule—

(a)

“a modified prototype” means a prototype which, prior to modification, has already been examined by a meter examiner;

(b)

“a rotary positive displacement meter” means a meter constructed so that it contains a rotating partition; and

(c)

“a turbine meter” means a meter constructed so that it contains a turbine wheel.”