Paragraph 28 I1
England and Wales
In this Part—
-
“apparatus” means the cables, structures or other infrastructure owned, occupied or maintained by Cottam or its successor in title within the Cottam Work No. 6B Area;
-
“construction” includes execution, placing, altering, replacing, reconstruction, relaying, maintenance, extensions, enlargement and removal; and “construct” and “constructed” must be construed accordingly;
-
“Cottam” means an undertaker with the benefit of all or part of the Cottam Solar Order for the time being;
-
“Cottam Solar Order” means the Cottam Solar Project Order as granted by the Secretary of State following the examination of the project known as Cottam Solar Project and given reference number EN010133 by the Planning Inspectorate;
-
“Cottam Work No. 6B Area” means the area for Work No. 6B authorised in the Cottam Solar Order;
-
“plans” includes sections, drawings, specifications, designs, design data, software, soil reports, calculations, descriptions (including descriptions of methods of construction), staging proposals, programmes and details of the extent, timing and duration of any proposed occupation of the Cottam Work No. 6B Area;
-
“specified works” means so much of any works or operations authorised by this Order (or authorised by any planning permission intended to operate in conjunction with this Order) as is—
- (a)
within the Cottam Work No. 6B Area;
- (b)
in, on, under, over or within 25 metres of the Cottam Work No. 6B Area or any apparatus; or
- (c)
may in any way adversely affect any apparatus.
- (a)
Annotations
Commencement
- I1
Sch. 14 para. 28 in force at 3.8.2024, see art. 1
Notes on the whole SI
Textual amendments
- F1
Words in Preamble omitted (28.11.2024) by virtue of The Gate Burton Energy Park (Correction) Order 2024 (S.I. 2024/1249), art. 1, Sch.