In the local government areas of Renfrewshire and the City of Glasgow—

  • Work No. 4 – A railway (6,813 metres in length) commencing by a junction with Work No. 3 at its termination, passing eastwards and terminating at a point 155 metres north of the junction of Woodrow Circus with Maxwell Drive. Work No. 4 includes realignment of the existing tracks and the widening of the bridge carrying the railway over Sandwood Road.

  • Work No. 4A – A railway (298 metres in length) forming cross-overs between the Up line and Down line of the Glasgow Central to Ayr railway and the intended railway in Work No.4 including the realignment of the junction into Deanside Sidings, commencing by a junction with the Deanside Sidings railway at a point 125 metres north-east of the junction of Lintlaw Drive and Ladykirk Drive and terminating by a junction with the Glasgow Central to Ayr railway at a point 125 metres east of the bridge carrying Berryknowes Road over the railway.