M3 Development and buildings M3 Development and buildingsF1
F1Interpretation
“"Devolved associated line”” means an overhead line that—
- (a)
is associated with a generating station that is or (when constructed or extended) is expected to be—
- (i)
in Wales or the Welsh zone, but
- (ii)
not within section 15(3A) or (3B) of the Planning Act 2008, and
- (i)
- (b)
has or will (when installed) have a nominal voltage no greater than 132 kilovolts.
- (a)
“"Railway”” has the meaning given by section 67(1) of the Transport and Works Act 1992.
“"Relevant nationally significant infrastructure project”” means a project falling within paragraph (a), (c), (g) or (j) of section 14(1) of the Planning Act 2008.
“"Specified Crown land”” means land—
- (a)
belonging to Her Majesty in right of the Crown;
- (b)
belonging to Her Majesty in right of the Duchy of Lancaster;
- (c)
belonging to the Duchy of Cornwall;
- (d)
held or used by a Minister of the Crown or a government department.
- (a)
“"Specified undertaker land”” means land held or used by a statutory undertaker in the exercise of a statutory power that relates to a matter in paragraph 96, 97(f) and (g), 99, 117, 121 or 125.
Annotations
Textual amendments
- F1
Schs. 7A, 7B substituted for Sch. 7 (1.4.2018) by Wales Act 2017 (c. 4), s. 71(3), Sch. 1 (with Sch. 7 paras. 1, 2, 6); S.I. 2017/1179, reg. 2
- F1
Schs. 7A, 7B substituted for Sch. 7 (1.4.2018) by Wales Act 2017 (c. 4), s. 71(3), Sch. 1 (with Sch. 7 paras. 1, 2, 6); S.I. 2017/1179, reg. 2