Regulation 21 Requirement to notify premises
England and Wales
Premises duly notified to the F3NRBW in accordance with this Part are notified premises for the purposes of these Regulations for the period of twelve months (“the period of notification”) commencing at the effective time and ending at the end of the last day of that twelve month period.
It is the duty of a hazardous waste producer to notify the relevant premises in accordance with regulations 24 and 26 if they have not otherwise already been notified.
Without prejudice to paragraph (3), a consignor may, in the circumstances described in regulation 25, notify the site premises in accordance with that regulation and regulation 26.
Annotations
Textual amendments
- F1
Words in reg. 21(1) inserted (18.11.2009) by The Hazardous Waste (Wales) (Amendment) Regulations 2009 (S.I. 2009/2861), regs. 1(1), 8
- F2
Word in reg. 21(1) substituted (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (S.I. 2013/755), art. 1(2), Sch. 5 para. 30(a) (with Sch. 7)
- F3
Word in reg. 21(2) substituted (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (S.I. 2013/755), art. 1(2), Sch. 5 para. 30(a) (with Sch. 7)