OpenLegislation

Paragraph 9 F1

United Kingdom

For the purpose of this Schedule, the one year period and 10 year period subsequent to installation begin the day after completion of the installation of—

(a)

all the meters F2and temperature control devices in a building, or

(b)

all the heat cost allocators, thermostatic radiator valves and hot water meters in a building.

Annotations

Textual amendments

F1

Sch. 1 omitted (E.W.S.) (27.1.2026) by virtue of The Heat Networks (Market Framework) (Great Britain) (Amendment) Regulations 2026 (S.I. 2026/7), regs. 2(2)(c), 12(12)

F2

Words in Sch. 1 para. 9(a) inserted (27.11.2020) by The Heat Network (Metering and Billing) (Amendment) Regulations 2020 (S.I. 2020/1221), regs. 1(2), 14(11)

Notes on Schedule 1

Textual amendments

F2

Word in Sch. 1 heading substituted (27.11.2020) by The Heat Network (Metering and Billing) (Amendment) Regulations 2020 (S.I. 2020/1221), regs. 1(2), 14(2)

F3

Words in Sch. 1 substituted (27.11.2020) by The Heat Network (Metering and Billing) (Amendment) Regulations 2020 (S.I. 2020/1221), regs. 1(2), 14(3)