Schedule 2 Table of fees payable
| (1) | (2) |
|---|---|
| Category of development for which approval is sought | Fee payable |
| 1. Plans and specifications for the following works | |
| A | |
| (i) Building works – the erection, construction, alteration or extension of a building, other than a temporary building and excluding anything in C below. |
|
| (ii) Fences and walls – the erection, alteration or extension of any fence or wall (other than sight, noise or dust screens). | |
| (iii) Sight, noise or dust screens – the erection, alteration or extension of any fences, walls or other barriers (including bunds) for visual or noise screening and dust suppression. | |
| (iv) Artificial lighting equipment – the erection, alteration, extension or installation of lighting equipment. | |
| B Road vehicle park – does not include anything that is not a building. | £195. |
| C Earthworks – the erection, alteration or extension of any terracing, cuttings, embankments or other earth works | £195 for each 0.1 hectares or part thereof of the site, subject to a maximum of £1,690. |
| D | |
| (i) Telecommunication masts or pedestrian access to the railway line. | £195. |
| (ii) Transformers. | The criteria in (a) to (e) in category 1A apply for the calculation of the fee. |
| 2. Matters ancillary to development | |
A. Handling of re-useable spoil or top soil – handling during removal, storage and re-use of any spoil or top soil removed during the course of carrying out the development. | £195. |
B. Storage sites – sites on land within the Act limits at which materials are to be stored until used or re-used in carrying out the development or disposal as waste. | £195. |
| C. Construction camps – sites on land within the Act limits which are to be used for the residential accommodation of persons engaged in carrying out the development. | £195. |
| D. Works screening – the provision where necessary on land within the Act limits of any screening for working sites on such land required for the purpose of carrying out the development. | £195. |
| E. Artificial lighting – the use of artificial lighting on land within the Act limits for the purpose of carrying out the development. | £195. |
| F. Dust Suppression – the suppression caused by construction operations carried out on land within the Act limits for the purpose of carrying out the development. | £195. |
G. Road mud control measures – the measures to be taken on land within the Act limits to prevent or reduce the carrying of mud on to any public highway as a result if carrying out the development. | £195. |
| 3. Road Transport | |
Arrangements concerning road transport – the arrangements regarding the routes by which anything is to be transported on a highway by a large goods vehiclef1 to a working or storage site; a site where it will be re-used; or a waste disposal site. | £195. |
| 4. Waste and spoil disposal and excavations | |
The development to the extent it consists of waste and spoil disposal or the excavation of bulk materials from borrow pits. | £195 for each 0.1 hectares or part thereof of the site area, subject to a maximum of £29,112. |
| 5. Bringing scheduled works or deposits into use | |
Arrangements for bringing into use scheduled works and depots. | £195. |
| 6. Mitigation Schemes | |
Measures to mitigate the effect of the work or its operation on the local environment or local amenity (see paragraph 9(4)(b) of the Schedule). | £195. |
| 7. Site restoration schemes | |
A site restoration scheme. | £195. |
| 8. Additional details | |
A request for approval of additional details where that approval is required under paragraph 2(3), 3(4) or 7(4) of the Schedule. | £97. |
| 9. Non-material changes | |
| The request for a non-material change of any approval (paragraph 21 of the Schedule). | £195. |
Annotations
Footnotes
- f1
-
See paragraph 6(7) of Schedule 17 to the High Speed Rail (West Midlands – Crewe) Act 2021 where this term is defined.