Section 90GA Special procedure for certain traffic calming works in London.F3
England and Wales
Traffic calming works fall within this section if—
the works are constructed by a local highway authority in Greater London, and
the requirements of F1subsections (2), (3) and (4) below have been complied with.
The requirement of this subsection is that before starting to construct the works the authority concerned gives the Secretary of State notice stating—
the nature, dimensions and location of the proposed works,
the type and description of signs which are proposed to be located in the highway in connection with the proposed hump, and
the period (of not less than one month) within which, and the address to which, the Secretary of State may send any comments on the proposal to the authority.
The requirement of this subsection is that in deciding—
whether to proceed with the construction of the works, and
what the nature, dimensions and location of the works as constructed are to be,
the authority concerned has regard to any comments made by the Secretary of State within the period stated in the notice.
The requirement of this subsection is that the authority concerned complies with such requirements as to consultation and publicity as may be prescribed by regulations made by the Secretary of State.
Annotations
Textual amendments
- F1
Words in s. 90GA(1)(b) substituted (27.5.2000) by S.I. 2000/1435, art. 2, Sch. Pt. I para. 7(3)
- F2
S. 90GA(4) inserted (27.5.2000) by S.I. 2000/1435, art. 2, Sch. Pt. I para. 7(2)(4)
- F3
S. 90GA inserted (3.7.2000) by 1999 c. 29, s. 269(4) (with Sch. 12 para. 9(1)); S.I. 2000/801, art. 2(2)(c), Sch.
Notes on Part V
Modifications
- C1
Pt. V (ss. 62-105) extended (13.2.1992) by Severn Bridges Act 1992 (c. 3), s. 32(2)(a)
Notes on Other traffic calming works
Textual amendments
- F1
Ss. 90G-90I and cross-heading inserted (16.5.1992) by Traffic Calming Act 1992 (c. 30), ss. 1(2), 3, Sch. 1