Article 3 Development consent for authorised development etc.I1

England, Wales and Scotland

(1)

Subject to the provisions of Schedule 2 (requirements) (“the requirements”) and the other provisions of this Order, the undertaker is granted development consent for the authorised development, to be carried out in the lines or situations shown on the works plans and in accordance with the approved plans.

(2)

In constructing or maintaining any of the authorised development, the undertaker may deviate laterally from the lines or situations shown on the works plans within the limits of deviation relating to that work shown on those plans.

(3)

In constructing or maintaining Work No. 2A, Work No. 2C and Work No. 2E, the undertaker may deviate vertically to any extent provided that no part of these works is less than 10 metres below the seabed or more than 50 metres below the seabed.

(4)

In constructing or maintaining Work No. 2G the undertaker may deviate vertically to any extent provided that no part of these works is more than 25 metres below the seabed.

(5)

Paragraphs (1), (2), (3) and (4) only authorise the carrying out of works within the Order limits.

Annotations

Commencement

I1

Art. 3 in force at 9.4.2013, see art. 1