In the District of Sedgemoor and the County of Somerset In the District of Sedgemoor and the County of Somerset
England, Wales and Scotland
Work No. 7A
A park and ride facility comprising the following works—
- (a)
site preparation works including construction, perimeter enclosure, ecological fencing and security; establishment of site construction compounds; construction related buildings, structures, plant, machinery and construction lighting;
- (b)
earthworks including ground levelling, creation of spoil bunds; utilities trenches; surface water drainage system including detention pond; foul water drainage system including waste water treatment works; enabling works for flood relief channel; and landscape works, including the provision of ecological habitat;
- (c)
bus stops and associated structures;
- (d)
site access junction and bridge, internal access roads and badger tunnel, hardstanding and vehicle, motorcycle and bicycle parking areas;
- (e)
amenity and security buildings, associated structures and plant;
- (f)
CCTV poles and mountings, lighting poles and fittings;
- (g)
perimeter and internal fencing, pedestrian / footpath connections, ecological fencing, signage, secured entrance, gates and barriers; and
- (h)
demolition / removal of temporary buildings, structures, hardstanding areas and parking areas and associated post operation phase works.
The location of the above works is shown on sheet no. 15.
- (a)
Work No. 7B
Widening of the existing A39 road at the proposed site access, including provision of a pedestrian island and a footway, approximately 372m in length, from the proposed site access to the A39 Roundabout, the location of which is shown on sheet no. 15.
Notes on Part 1
Commencement
- I1
Sch. 1 Pt. 1 in force at 9.4.2013, see art. 1