Other Site Structures Other Site StructuresF1
Sea Wall (Incorporating Coastal Footpath)
| Drawing number | Rev | Drawing title | Scale | >Paper size |
|---|---|---|---|---|
| HINK-A2-HSW-00-GA-001 | 02 | Plans | 1:500 | A0 |
| HINK-A2-HSW-00-GA-002 | 01 | North Elevation | 1:50 | A0 |
| HINK-A2-HSW-00-GA-003 | 01 | Detail Plans and Elevations | 1:50 | A0 |
| HINK-A2-HSW-00-GA-004 | 02 | Detail Plan and Elevation | 1:100 | A0 |
EDF Energy Pylons
| Drawing number | Rev | Drawing title | Scale | >Paper size |
|---|---|---|---|---|
| HINK-A1-PL-00-GA-001 | 01 | Location Plan, Plans, Elevations and Axonometric | Various | A1 |
Back Up Power Containerised Generator 1 - Near to the Main Access Building
| Drawing number | Rev | Drawing title | Scale | >Paper size |
|---|---|---|---|---|
| HINK-A2-LLY-00-GA-001 | 01 | Plan and Elevations | 1:100 | A1 |
Back Up Power Containerised Generator 2 - Near to the Operational Service Building
| Drawing number | Rev | Drawing title | Scale | >Paper size |
|---|---|---|---|---|
| HINK-A2-LLV-00-GA-001 | 01 | Plan and Elevations | 1:100 | A1 |
Back Up Power Containerised Generator 3 – Near to the Areva Warehouse
| Drawing number | Rev | Drawing title | Scale | >Paper size |
|---|---|---|---|---|
| HINK-A2-LLW-00-GA-001 | 01 | Plan and Elevations | 1:100 | A1 |
Annotations
Textual amendments
- F1
Words in Sch. 1 Pt. 3 substituted (24.3.2018) by The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018 (S.I. 2018/413), art. 1, Sch.