Article 4 Power to construct worksI1
England, Wales and Scotland
Subject to article 5 (power to deviate), the Company may in the lines and situations and upon the lands delineated on, and within the limits of deviation shown on, and according to the levels shown on, the deposited plans and sections, construct, maintain and use the following works—
-
Work No. 1 – A jetty of open piled construction including an elevated roadway and comprising a concrete deck supported on steel tubular piles commencing at a point at ST1953846080 and extending in a north westerly direction into Bridgwater Bay for a distance of 506 metres and terminating at a point at ST1928546519, the location of which is shown on sheet no. 2 and the sections of which are shown on sheets nos. 11 and 12.
-
Work No. 2 – A covered conveyor for transporting aggregates installed on Work No. 1 commencing at a point at ST1968845829 and extending in a north westerly direction for a distance of 788 metres and terminating at a point at ST1931146515, the location of which is shown on sheet no. 3 and the sections of which are shown on sheets nos. 11 and 12.
-
Work No. 3 – A pipeline for transporting cement and cement replacement products installed on Work No. 1 commencing at a point at ST1968846053 and extending generally in a north westerly direction for a distance of 655 metres and terminating at a point at ST1929246510, the location of which is shown on sheet no. 4 and the sections of which are shown on sheets nos. 11 and 12.
-
Work No. 4 – An area of hardstanding for the storage of construction materials such as aggregates, sand and cement comprising 8.4 hectares incorporating roadways, a covered area for the storage of sand and forming in part the site of Work No. 5 and site construction facilities and incorporating a separator for oil and water together with a water management zone, the location of which is shown on sheet no. 5 and the sections of which are shown on sheets nos. 11 and 12.
-
Work No. 5 – A series of eight silos for the storage of cement, the location of which is shown on sheet no. 6 and the sections of which are shown on sheet no. 12.
-
Work No. 6 – A service road, the location of which is shown on sheet no. 7 and the section of which is shown on sheet no. 11.
-
Work No. 7 – An access corridor along the foreshore to Works Nos. 1 to 3, the location of which is shown on sheet no. 7.
-
Work No. 8 – A rock extraction area to be used for sourcing material for the construction of Works Nos. 4 and 6, the location of which is shown on sheet no. 8 and the section of which is shown on sheet no. 11.
-
Work No. 9 – Areas for the storage respectively of the topsoil and subsoil excavated from the sites of Works Nos. 4 and 8, the location of which is shown on sheet no. 9 and the section of which is shown on sheet no. 11.
-
Work No. 10 – A security fence having a height not exceeding 1.8 metres to be constructed along the lines shown on sheet no. 10, details of which are shown on sheet no. 12.
The Company may, for the purposes of the works authorised by paragraph (1), remove any vegetation or other objects or materials and dismantle, demolish and remove any structures or apparatus lying within the limits of deviation shown on the deposited plans and sections.
The Company may reconstruct, extend, enlarge, replace or relay a work authorised by paragraph (1) within the limits of deviation provided for that work under article 5 (power to deviate) and may maintain and use that work as reconstructed, extended, enlarged, replaced or re-laid.
In paragraph (1) a reference to a point is a reference to an Ordnance Survey National Grid reference point.
Annotations
Commencement
- I1
Art. 4 in force at 16.8.2012, see art. 1(1)