Schedule 1 AUTHORISED DEVELOPMENTI1

England, Wales and Scotland

In the County Borough of Rhondda Cynon Taf—

  • A nationally significant infrastructure project as defined in sections 14(1)(a) and 15 of the 2008 Act consisting of a generating station with a gross rated electrical output of up to 299MWe comprising—

    • Numbered work 1 development comprising the demolition of all existing buildings and structures, including foundations, hardstanding and services,

    • Numbered work 2A development comprising—

      1. (a)

        up to 5 gas turbine generators; and

      2. (b)

        up to 5 exhaust gas emission flue stacks,

    • Numbered work 2B development comprising—

      1. (a)

        an administration building;

      2. (b)

        a store;

      3. (c)

        a control room/office/workshop;

      4. (d)

        telemetry apparatus;

      5. (e)

        F1three black start diesel generators where one gas turbine generator is constructed and one black start diesel generator where two, three, four or five gas turbine generators are constructed;

      6. (f)

        a natural gas receiving station and gas treatment compound containing—

        1. (i)

          a pipeline inspection gauge (PIG) receiving facility;

        2. (ii)

          isolation valves, metering, heating, filtering, compression, pressure regulation equipment;

        3. (iii)

          electricity supply kiosk; and

        4. (iv)

          control and instrumentation kiosks,

      7. (g)

        F2external fin fan cooler (where only one gas turbine generator is constructed).

    • Numbered work 2C development comprising a switchyard / banking compound containing up to eight transformers, switchgear building and other plant required to manage the transmission of electricity,

    • Numbered work 2D development comprising a construction and maintenance compound including new hardstanding,

    • Numbered work 2E development comprising—

      1. (a)

        security infrastructure, including cameras, perimeter fencing and a gatehouse;

      2. (b)

        site lighting infrastructure, including perimeter lighting columns;

      3. (c)

        internal roadways, car parking, pedestrian network, cycle parking, hardstanding and water treatment trailers;

      4. (d)

        site drainage, attenuation pond and waste management infrastructure;

      5. (e)

        electricity, water, wastewater and telecommunications and other services;

      6. (f)

        a raw / fire water tank and demineralised water storage tank;

      7. (g)

        landscaping including tree planting, fencing and other boundary treatments and ecological mitigation (including bat mitigation structure);

      8. (h)

        tree and hedge removal;

      9. (i)

        high voltage and low voltage cabling, equipment and controls and associated telemetry and electrical protection auxiliary cabling;

      10. (j)

        underground gas pipeline connection, associated telemetry and cathodic protection test / transformer rectifier unit; and

      11. (k)

        other ancillary equipment,

    • Numbered work 2F development comprising new or modified permanent means of access to numbered work 2 including permanent road surface, drainage, gates and fencing,

    • Numbered work 2G development comprising the maintenance strengthening or re-laying in a new location of the existing culvert forming that part of ordinary watercourse River Camnant within the Order limits, such works subject to maintaining the existing flow rate.

Annotations

Textual amendments

F1

Words in Sch. 1 substituted (12.11.2016) by The Hirwaun Generating Station (Amendment) Order 2016 (S.I. 2016/1087), arts. 1, 5(2)

F2

Words in Sch. 1 inserted (12.11.2016) by The Hirwaun Generating Station (Amendment) Order 2016 (S.I. 2016/1087), arts. 1, 5(3)

Commencement

I1

Sch. 1 in force at 14.8.2015, see art. 1