OpenLegislation

Paragraph 1 Report

Original text. Later amendments are not shown.

A report on a home not physically complete must consist of—

(a)

a statement of the day or the predicted day on which the property is likely to be physically complete;

(b)

a statement of whether the property will be—

(i)

a house;

(ii)

a bungalow;

(iii)

a flat; or

(iv)

a maisonette.

(c)

if the property will be a house or bungalow, a statement of whether it will be—

(i)

detached;

(ii)

semi-detached; or

(iii)

terraced;

(d)

if the property will be a flat or maisonette, a statement of—

(i)

the total number of floors in the building;

(ii)

the total number of the flats or maisonettes in the building;

(iii)

whether there will be a lift to the floor on which the entrance to the property will be situated;

(e)

a statement of the approximate total useable floor area in the property (in square metres);

(f)

a description of the proposed methods of building (including any trade names for the materials described);

(g)

a description of the materials used or to be used in the outside parts of the property;

(h)

a description of the heating and hot-water systems to be used for the property;

(i)

a description of the standards to which the garden or other land being sold with the property will be finished;

(j)

a statement as to whether any land on the site has been or will be brought up to the level of the surrounding area artificially;

(k)

a statement as to whether a new homes warranty complying with Schedule 6 has been offered for the building, completion or conversion of the property and whether the property will qualify for such a warranty; and

(l)

if the property will not qualify for such a warranty, a statement of the name and qualifications of the person monitoring the building, completion or conversion of the property.