The Home Information Pack Regulations 2006
S.I. 2006/1503 · Made 9 June 2006
HOUSING, ENGLAND AND WALES
Made 9th June 2006
Laid before Parliament 14th June 2006
Coming into force
for the purposes of Part 7 6th July 2006
for all other purposes 1st June 2007
The Secretary of State makes the following Regulations in exercise of the powers conferred by sections 161, 163, 164 and 250(2) of and paragraphs 2 and 11(b) of Schedule 8 to the Housing Act 2004f1.
Under section 250(3) of that Act, the Secretary of State has consulted the National Assembly for Wales in relation to residential properties in Wales.
Annotations to the whole text
Footnotes
- f1
Contents
- Part 1: CITATION, COMMENCEMENT AND INTERPRETATION
- 1Citation and commencement
- 2Interpretation – general provisions
- 3Interpretation – first point of marketing
- Part 2: HOME INFORMATION PACK - GENERAL PROVISIONS
- 4Required, authorised and excluded documents
- 5The home information pack
- 6Copies of a home information pack
- 7Comprehension of documents
- Part 3: CONTENTS OF HOME INFORMATION PACKS
- 8Required pack documents
- 9Authorised pack documents
- 10Creation of interests
- 11Prohibitions relating to home condition reports
- 12Exclusion of advertising information
- Part 4: ASSEMBLY AND ACCURACY OF HOME INFORMATION PACKS
- 13Time at which pack documents are to be included
- 14Age of pack documents when first included
- 15Required pack documents which are unavailable before the first point of marketing
- 16Delivery of documents under regulation 15
- 17Required pack documents which are unobtainable
- 18Updating of required pack documents
- 19Inclusion of home condition reports or energy performance certificates following physical completion
- 20Updating of authorised pack documents
- 21Seller’s check of the home information pack
- Part 5: EXCEPTIONS
- 22Meaning of “non-residential premises”
- 23Exclusion from meaning of “non-residential premises”
- 24Exception for seasonal and holiday accommodation
- 25Exception for mixed sales
- 26Exception for dual use of a dwelling-house
- 27Exception for portfolios of properties
- 28Exception for unsafe properties
- 29Exception for properties to be demolished
- 30Exception – 1st June 2007 to 31st October 2007
- Part 6: ENFORCEMENT
- 31Amount of penalty charge
- 32Exclusion of penalty charges for content of pack documents
- Part 7: APPROVED CERTIFICATION SCHEMES
- 33Approval of certification schemes
- 34Terms of approved certification schemes
- 35Withdrawal of approval from certification schemes
- Signature
- Schedule 1: Home information pack index
- 1Required matters
- 2Authorised matters
- Schedule 2Sale statement
- Schedule 3: Commonhold information
- 1Required commonhold documents
- 2Required commonhold information
- 3Authorised commonhold information
- 4Creation of commonhold interests
- Schedule 4: Leasehold information
- 1Required leasehold documents
- 2Required leasehold information
- 3Authorised leasehold information
- 4Creation of leasehold interests
- Schedule 5: Home condition report
- 1Home condition reports
- 2Terms for the preparation of a home condition report
- 3Third party contractual rights in relation to home condition reports
- 4Inclusion of additional or more favourable terms for home condition reports
- 5Less favourable terms
- 6Completion of home condition reports by home inspectors
- 7Conduct of inspections
- 8Prohibition on personal and security information
- Schedule 6: Exception from home condition report for specific new homes warranties
- Part 1: General
- 1Interpretation
- 2New homes warranties – general
- Part 2: Arrangements for entering into specific new homes warranties
- 3Existence of insurance and regulation of warranty provider
- 4Cover notes
- 5Commencement date
- Part 3: Minimum cover for specific new homes warranties
- 6Warranty period
- 7Certificate of cover and copy of new homes warranty
- 8Transfer of cover to future owners
- 9Cover for design and building
- 10Developer cover
- 11Structural defects cover to property and common parts throughout the new homes warranty
- 12Additional defects cover for property – first two years
- 13Cover for costs of alternative accommodation
- 14Professional fees
- Part 4: Limits on cover for specific new homes warranties
- 15Permitted limits for newly built properties
- 16Permitted limits for converted premises
- 17Permitted excesses
- 18Permitted limits on cover for costs of alternative accommodation
- 19Permitted limits on cover for professional fees
- Schedule 7: Report on a home not physically complete
- 1Report
- 2Attachments
- Schedule 8: General provision on searches and search reports
- Part 1: All search reports (other than official search certificate of the local land charges register)
- 1General requirements
- 2Additional search information
- 3Unavailable search results
- Part 2: Specific required search reports
- 4Terms for the preparation of required searches
- 5Third party contractual rights in relation to search reports
- 6Insurance cover for third party contractual rights
- 7Permitted limit on liability for financial loss
- 8Inclusion of additional or more favourable terms for required search reports
- 9Less favourable terms
- 10Required searches by another name
- Part 3: Authorised search reports
- 11Terms for the preparation of authorised search reports
- Schedule 9: Local enquiries
- Part 1: General
- 1Interpretation
- 2Enquiries
- Part 2: Enquiries
- 3Planning and building decisions and pending applications
- 4Planning designations and proposals
- 5Roads
- 6Land required for public purposes
- 7Land to be acquired for road works
- 8Drainage agreements and consents
- 9Nearby road schemes
- 10Nearby railway schemes
- 11Traffic schemes
- 12Outstanding notices
- 13Contravention of building regulations
- 14Notices, orders, directions and proceedings under Planning Acts
- 15Conservation areas
- 16Compulsory purchase
- 17Contaminated land
- 18Radon gas
- Schedule 10: Drainage and water enquiries
- Part 1: General
- 1Interpretation
- 2Enquiries and responses
- Part 2: Enquiries and responses
- 3Public sewer map
- 4Foul water
- 5Surface water
- 6Public adoption of sewers and lateral drains
- 7Public sewers within the boundaries of the property
- 8Public sewers near to the property
- 9Building over a public sewer, disposal main or drain
- 10Map of waterworks
- 11Adoption of water mains and service pipes
- 12Sewerage and water undertakers
- 13Connection to mains water supply
- 14Water mains, resource mains or discharge pipes
- 15Current basis for sewerage and water charges
- 16Charges following change of occupation
- 17Surface water drainage charges
- 18Water meters
- 19Sewerage bills
- 20Water bills
- 21Risk of flooding due to overloaded public sewers
- 22Risk of low water pressure or flow
- 23Water quality analysis
- 24Authorised departures from water quality standards
- 25Sewage treatment works
- Schedule 11Additional relevant information
- Explanatory note