Within the export cable area—

(a)

Work No. 2a—

a connection consisting of subsea cables from one or more of the wind turbine generators comprised within Work No. 1a to shore, including cable crossing works, and terminating at the cable transition pit; and

(b)

Work No. 2b—

a cable transition pit, including cables.

Co-ordinates for export cable area

PointLatitude (DMS)Longitude (DMS)
B151°26′49.516″01°03′25.151″
B251°26′57.154″01°04′41.017″
B351°26′49.200″01°04′51.000″
B451°27′08.400″01°08′02.400″
B551°26′44.304″01°08′32.636″
B651°26′30.954″01°06′19.501″
B751°22′34.716″01°06′13.284″
B851°22′20.604″01°05′58.812″
B951°22′19.812″01°05′58.812″
B1051°22′19.92″01°05′56.256″
B1151°22′33.685″01°05′26.707″
B1251°26′26.282″01°05′32.847″
B1351°26′17.484″01°04′05.369″

Annotations

Commencement

I1

Sch. 1 Pt. 1 para. 2 in force at 20.2.2013, see art. 1