Paragraph 2 Associated developmentI1
England, Wales and Scotland
Within the export cable area—
(a)
Work No. 2a—
a connection consisting of subsea cables from one or more of the wind turbine generators comprised within Work No. 1a to shore, including cable crossing works, and terminating at the cable transition pit; and
(b)
Work No. 2b—
a cable transition pit, including cables.
Co-ordinates for export cable area
| Point | Latitude (DMS) | Longitude (DMS) |
|---|---|---|
| B1 | 51°26′49.516″ | 01°03′25.151″ |
| B2 | 51°26′57.154″ | 01°04′41.017″ |
| B3 | 51°26′49.200″ | 01°04′51.000″ |
| B4 | 51°27′08.400″ | 01°08′02.400″ |
| B5 | 51°26′44.304″ | 01°08′32.636″ |
| B6 | 51°26′30.954″ | 01°06′19.501″ |
| B7 | 51°22′34.716″ | 01°06′13.284″ |
| B8 | 51°22′20.604″ | 01°05′58.812″ |
| B9 | 51°22′19.812″ | 01°05′58.812″ |
| B10 | 51°22′19.92″ | 01°05′56.256″ |
| B11 | 51°22′33.685″ | 01°05′26.707″ |
| B12 | 51°26′26.282″ | 01°05′32.847″ |
| B13 | 51°26′17.484″ | 01°04′05.369″ |
Annotations
Commencement
- I1
Sch. 1 Pt. 1 para. 2 in force at 20.2.2013, see art. 1