Paragraph 8 I1
In the event that cable installation works take place between October and April (inclusive) any such works between mean low water and mean high water shall avoid the period two hours either side of high water to avoid disturbance to roosting turnstone.
Annotations
Commencement
- I1
Sch. 2 para. 8 in force at 20.2.2013, see art. 1