Paragraph 19 Air SafetyI1
England and Wales
No part of the authorised development comprising the generating station may commence until the undertaker has notified the Ministry of Defence – Defence Geographic Centre in relation to the generating station of—
the precise location of the authorised development with grid coordinates;
the proposed date of commencement of construction;
the height above ground level in metres of the tallest structure;
the maximum extension height in metres of any construction equipment.
The undertaker must ensure that any stacks are fitted with aviation warning lighting with a minimum intensity of 25 candela omni directional red light or equivalent infra-red light fitted at the highest practicable point of the structure.
Within 28 days of completion of the construction of the generating station the undertaker must notify the Ministry of Defence – Defence Geographic Centre of the date of such completion of construction.
Annotations
Commencement
- I1
Sch. 1 para. 19 in force at 1.4.2015, see art. 1