Schedule 14 DOCUMENTS TO BE CERTIFIEDI1
England and Wales
| (1)Document | (2)Description |
|---|---|
| book of reference | The book of reference contained in document reference [SCC/LLTC/EX/ F1183]. |
| classification of roads plan | The classification of roads plan revision number P01 contained in document reference [SCC/LLTC/EX/136]. |
| drainage strategy | The drainage strategy contained in document reference [SCC/LLTC/EX/168]. |
| engineering section drawings and plans | The engineering section drawings and plans revision number P0 contained in document reference 2.9 subject to the substitutions set out below: (a) Key Plan revision number P01 contained in document reference [SCC/LLTC/EX/140]; (b) Mainline Key Plan revision number P01 contained in document reference [SCC/LLTC/EX/141]; (c) Mainline Sheet 1 revision number P01 contained in document reference [SCC/LLTC/EX/142]; (d) Mainline Sheet 2 revision number P02 contained in document reference [SCC/LLTC/EX/143]; (e) Side Roads Key Plan revision number P01 contained in document reference [SCC/LLTC/EX/144]; (f) Side Roads Sheet 5 revision number P01 contained in document reference [SCC/LLTC/EX/145]; (g) Side Roads Sheet 6 revision number P01 contained in document reference [SCC/LLTC/EX/146]; (h) Side Roads Sheet 7 revision number P01 contained in document reference [SCC/LLTC/EX/147]; (i) Side Roads Sheet 8 revision number P01 contained in document reference [SCC/LLTC/EX/148]; and (j) Side Roads Sheet 9 revision number P01 contained in document reference [SCC/LLTC/EX/F2148]. |
| environmental statement | The environmental statement, figures and appendices contained in document references 6.1, 6.2 and 6.3 (subject to the substitutions set out below): (k) Chapter 11 of the Environmental Statement contained in document reference [SCC/LLTC/EX/F370]; (l) Chapter 12 of the Environmental Statement contained in document reference [SCC/LLTC/EX/86]; (m) the interim code of construction practice (appendix 5A); (n) the scheme-wide written scheme of investigation; (o) the ground investigation report; (p) the piling works risk assessment; (q) the sediment transport assessment (appendix 17C) contained in document reference [SCC/LLTC/EX/36]; (r) Annex A to the flood risk assessment (appendix 18A) contained in document reference [SCC/LLTC/EX/47]; (s) Annex C figures 3.1 and 6.1 to the flood risk assessment (Appendix 18A) contained in document reference [SCC/LLTC/EX/167]; (t) the drainage strategy; and (u) the following figures: (i) 1.2 contained in document reference [SCC/LLTC/EX/155]; (ii) 4.1 and 4.3 contained in document reference [SCC/LLTC/EX/156]; (iii) 5.1 to 5.5 contained in document reference [SCC/LLTC/EX/157]; (iv) 8.2 contained in document reference [SCC/LLTC/EX/158]; (v) 9.1, 9.3 and 9.4 contained in document reference [SCC/LLTC/EX/159]; (vi) 11.3 and 11.6 contained in document reference [SCC/LLTC/EX/160]; (vii) 12.1 contained in document reference [SCC/LLTC/EX/161]; (viii) 13.1 contained in document reference [SCC/LLTC/EX/162]; (ix) 15.2 contained in contained in document reference [SCC/LLTC/EX/163]; (x) 17.1, 17.2 and 17.3 contained in document reference [SCC/LLTC/EX/164]; (xi) 18.1 and 18.2 contained in document reference [SCC/LLTC/EX/165]; and (xii) 19.2 and 19.3 contained in document reference [SCC/LLTC/EX/166]. |
| general arrangement plans | The general arrangement plans contained in the following documents: (v) Key Plan revision number P01 contained in document reference [SCC/LLTC/EX/121]; (w) Sheet 1 revision number P02 contained in document reference [SCC/LLTC/EX/122]; and (x) Sheet 2 revision number P01 contained in document reference F4[SCC/LLTC/EX/123]. |
| ground investigation report | The interpretative environmental ground investigation report contained in document reference [SCC/LLTC/EX/32]. |
| harbour limits plan | The harbour limits plan revision number P01 contained in document reference [SCC/LLTC/EX/153]. |
| highway lighting plan | The highway lighting plan contained at Figure 5.5 of the environmental statement. |
| interim code of construction practice | The interim code of construction practice contained in document reference [SCC/LLTC/EX/192]. |
| interim design guidance manual | The design guidance manual contained in document reference [SCC/LLTC/EX/17]. |
| land plans | The land plans revision number P0 contained in document reference 2.3 subject to the substitutions set out below: (y) Sheet 3 revision number P01 contained in document reference number [SCC/LLTC/EX/124]; (z) Sheet 4 revision number P01 contained in document reference number [SCC/LLTC/EX/125]; and (aa) Sheet 5 revision number P01 contained in document reference number [SCC/LLTC/EX/126]. |
| landscaping plans | The landscaping plans contained in the following documents: (bb) Key Plan revision number P02 contained in document reference [SCC/LLTC/EX/137]; (cc) Sheet 1 revision number P02 contained in document reference [SCC/LLTC/EX/138]; and (dd) Sheet 2 revision number P02 contained in document reference F5[SCC/LLTC/EX/139]. |
| limits of dredging plan | The limits of dredging plan revision number P01 contained in document reference [SCC/LLTC/EX/150]. |
| new bridge area plans | The new bridge area plans revision number P0 contained in document reference 2.13 subject to the substitutions set out below: (ee) Key Plan version number P01 contained in document reference [SCC/LLTC/EX/151]; and (ff) Sheet 2 revision number P01 contained in document reference [SCC/LLTC/EX/152]. |
| new bridge operating signals noise assessment | The new bridge operating signals noise assessment contained in appendix A to document reference [SCC/LLTC/EX/81]. |
| piling works risk assessment | The piling works risk assessment revision 1 contained in document reference [SCC/LLTC/EX/34]. |
| preliminary navigation risk assessment | The preliminary navigation risk assessment contained in document reference 6.9 subject to the substitution of the vessel survey report (appendix B) which is substituted by the vessel survey report contained in document reference [SCC/LLTC/EX/44]. |
| scheme of operation | The Scheme of Operation contained in document reference [SCC/LLTC/EX/209]. |
| rights of way and access plans | The rights of way and access plans contained in the following documents: (gg) Key Plan revision number F6P02 contained in document reference [SCC/LLTC/EX/129]; (hh) Sheet 1 revision number P01 contained in document reference [SCC/LLTC/EX/130]; and (ii) Sheet 2 revision number P02 contained in document reference [SCC/LLTC/EX/131]. |
| scheme-wide written scheme of investigation | The scheme-wide written scheme of investigation contained in document reference [SCC/LLTC/EX/67]. |
| transport assessment | The transport assessment contained in document reference [SCC/LLTC/EX/23] |
| traffic regulation measures plans | The traffic regulation measures plans revision number P0 contained in document reference 2.6 subject to the substitutions set out below: (jj) Key Plan F7revision number P01 contained in document reference [SCC/LLTC/EX/132]; (kk) Clearways and Prohibitions Sheet 1 revision number P01 contained in document reference [SCC/LLTC/EX/133]; (ll) Clearways and Prohibitions Sheet 2 revision number P02 contained in document reference [SCC/LLTC/EX/134]; (mm) Clearways and Prohibitions Sheet 3 revision number P01 contained in document reference [SCC/LLTC/EX/176]; and (nn) Speed Limits and Restricted Roads Sheet 2 revision number P01 contained in document reference [SCC/LLTC/EX/135]. |
| tree preservation order trees location plan | The tree preservation order trees location plan revision number P01 contained in document reference [SCC/LLTC/EX/149]. |
| works plans | The works plans revision number P0 contained in document reference 2.4 subject to the substitutions set out below: (pp) Sheet 2 revision number P02 contained in document reference [SCC/LLTC/EX/128]. |
Annotations
Textual amendments
- F1
Word in Sch. 14 substituted (22.10.2020) by The Lake Lothing (Lowestoft) Third Crossing (Correction) Order 2020 (S.I. 2020/1158), arts. 1, 2(9)(a)
- F2
Word in Sch. 14 substituted (22.10.2020) by The Lake Lothing (Lowestoft) Third Crossing (Correction) Order 2020 (S.I. 2020/1158), arts. 1, 2(9)(b)(ii)
- F3
Word in Sch. 14 substituted (22.10.2020) by The Lake Lothing (Lowestoft) Third Crossing (Correction) Order 2020 (S.I. 2020/1158), arts. 1, 2(9)(c)
- F4
Word in Sch. 14 substituted (22.10.2020) by The Lake Lothing (Lowestoft) Third Crossing (Correction) Order 2020 (S.I. 2020/1158), arts. 1, 2(9)(d)
- F5
Word in Sch. 14 substituted (22.10.2020) by The Lake Lothing (Lowestoft) Third Crossing (Correction) Order 2020 (S.I. 2020/1158), arts. 1, 2(9)(e)
- F6
Word in Sch. 14 substituted (22.10.2020) by The Lake Lothing (Lowestoft) Third Crossing (Correction) Order 2020 (S.I. 2020/1158), arts. 1, 2(9)(f)
- F7
Word in Sch. 14 substituted (22.10.2020) by The Lake Lothing (Lowestoft) Third Crossing (Correction) Order 2020 (S.I. 2020/1158), arts. 1, 2(9)(g)
- F8
Word in Sch. 14 substituted (22.10.2020) by The Lake Lothing (Lowestoft) Third Crossing (Correction) Order 2020 (S.I. 2020/1158), arts. 1, 2(9)(h)(i)
- F9
Word in Sch. 14 substituted (22.10.2020) by The Lake Lothing (Lowestoft) Third Crossing (Correction) Order 2020 (S.I. 2020/1158), arts. 1, 2(9)(h)(ii)
Commencement
- I1
Sch. 14 in force at 21.5.2020, see art. 1