OpenLegislation

The Leicestershire County Council (Zouch Bridge Replacement) Bridge Scheme 2017 Confirmation Instrument 2019

S.I. 2019/133 · Made 28 January 2019

Original text. legislation.gov.uk does not revise statutory instruments, so later amendments are not shown here. Changes made to it are listed under each provision when known.

Highways, England

Made 28th January 2019

Coming into force in accordance with article 1

The Secretary of State for Transport, makes this Instrument in exercise of the powers conferred by section 106(3) of the Highways Act 1980f1, and now vested in the Secretary of State f2:

Annotations to the whole text

Footnotes

f1

1980 c. 66. Section 106(3) is amended by the Infrastructure Act 2015 (c. 7), paragraph 34(2) of Schedule 1(1).

f2

S.I. 1981/238

Contents

  1. 1Section 1
  2. 2Section 2
  3. 3Section 3
  4. Signature
  5. Schedule THESchedule THE
  6. Schedule THE SCHEDULE TO THE SCHEMESchedule THE SCHEDULE TO THE SCHEME
  7. Explanatory note

1

This Instrument may be cited as “The Leicestershire County Council (Zouch Bridge Replacement) Bridge Scheme 2017 Confirmation Instrument 2019” and shall come into force on the date on which notice that it has been confirmed is first published in accordance with paragraph 1 of Schedule 2 to the Highways Act 1980.

2

The Leicestershire County Council (Zouch Bridge Replacement) Bridge Scheme 2017, and as set out in the Schedule, is hereby confirmed with modifications.

3

The Scheme as confirmed is set out in the Schedule (including the plan) and copies of the Scheme with its accompanying plan are deposited at the offices of the Department for Transport, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex TN37 7GA and at the offices of the Leicestershire County Council, County Hall, Glenfield, Leicestershire LE3 8RA.

Signature

Signed by authority of the Secretary of State for Transport

A Rhind

A Senior Civil Servant in the Department for Transport

28th January 2019

Schedule THE

The Leicestershire County Council (“the County Council”) on its own behalf and on behalf of Nottinghamshire County Council makes this Scheme in exercise of their powers under Section 8 of the Highways Act 1980 and under Section 106(3) of the Highways Act 1980 and all other powers enabling them in that behalf:-

1

The Council is authorised to construct over the navigable waters of the River Soar the bridge specified in the Schedule to this Scheme as part of the highway which they are proposing to construct as a replacement for Zouch Bridge carrying the A6006 from Hathern in the Parish of Hathern and the District of Charnwood in Leicestershire to Zouch in the Parish of Normanton on Soar and the District of Rushcliffe in Nottinghamshire.

2

This Scheme may be cited as The Leicestershire County Council (Zouch Bridge Replacement) Bridge Scheme 2017.

Given under the Common Seal of the Council
on the 6th day of October 2017
THE COMMON SEAL of
LEICESTERSHIRE COUNTY COUNCIL

was hereunto affixed in

the presence of:-

C.S
Duly Authorised Officer

Schedule THE SCHEDULE TO THE SCHEME

The location and general design of the Bridge are shown on the plan numbered MC0303-008 Rev C and annexed hereto marked ‘The Leicestershire County Council (Zouch Bridge Replacement) Bridge Scheme 2017’.

Explanatory note

(This note is not part of the Instrument)

This Instrument confirms a Scheme to construct over the navigable waters of the River Soar the bridge specified in the Schedule to this Scheme as part of the highway which they are proposing to construct as a replacement for Zouch Bridge carrying the A6006 from Hathern in the Parish of Hathern and the District of Charnwood in Leicestershire to Zouch in the Parish of Normanton on Soar and the District of Rushcliffe in Nottinghamshire.

The Secretary of State has modified this Bridge Scheme as follows:

1

In the Schedule to the Scheme, the title of the Schedule has been amended to “PLAN AND SPECIFICATIONS OF THE LEICESTERSHIRE COUNTY COUNCIL (ZOUCH BRIDGE REPLACEMENT) BRIDGE SCHEME 2017”

2

In the Schedule to the Scheme, the words “in width” have been added to the first sentence of the final paragraph after “12.65 metres”.

3

Drawing Number MC0303-008 Rev B has been replaced by Drawing Number MC0303-008 Rev C.