Paragraph 5
Where a notified body finds that essential health and safety requirements or corresponding harmonised standards or other technical specifications have not been met by an installer or a manufacturer, it must require the installer or the manufacturer to take appropriate corrective measures and must not issue a certificate of conformity or an approval decision.
Notes on Schedule 6
Textual amendments
- F1
Word in Sch. 6 heading substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 22 para. 43(a) (with Sch. 22 para. 37) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)