OpenLegislation

Regulation 3 Applying for listed building consentI1

England and Wales

(1)

In addition to the requirements of section 90(2) of the 2023 Act, an application for listed building consent must—

(a)

be on a form published or provided by the Welsh Ministers or a form substantially to the same effect, and

(b)

include the matters specified in the form.

(2)

Where an application is not made by electronic communication, the application and the documents contained in it must be provided in triplicate.

(3)

Paragraph (2) does not apply if the planning authority to which the application is made indicates that fewer copies are required.

(4)

Any plans or drawings must—

(a)

be drawn to an identified scale, and

(b)

in the case of plans, show the direction of north.

Annotations

Commencement

I1

Reg. 3 in force at 4.11.2024, see reg. 1(2)