Paragraph 8 I1

England, Wales and Scotland

(1)

If, during the construction of a specified work or within 10 years after the completion of a specified work, there is caused or created an accumulation or erosion or alteration of the tidal flow or littoral drift which causes damage, or reasonable expectation of damage, to flood defences, the Harbour Authority shall, if it is proven to have caused the damage or reasonable expectation of damage, remedy to the extent of its causation such accumulation, erosion, alteration of tidal flow or littoral drift to the extent and commensurate with the damage it is proven to have caused, in the manner specified in sub-paragraph (4) and, if it refuses or fails so to do, the Agency may itself cause work to be done and may recover the reasonable cost of such work from the Harbour Authority.

(2)

Should any accumulation or erosion or alteration of the tidal flow or littoral drift which causes damage or reasonable expectation of damage, arise within the said period of 10 years and be remedied in accordance with sub-paragraph (1), any recurrence of such accumulation or erosion or alteration of the tidal flow or littoral drift proven to be caused by the specified works shall from time to time be so remedied by the Harbour Authority during the said period of 10 years and at any time thereafter, save that the Harbour Authority’s obligation under this paragraph shall cease in the event that following the remedying of any accumulation or erosion or alteration of the tidal flow or littoral drift a period of 10 years elapses without any further accumulation or erosion or alteration of the tidal flow or littoral drift.

(3)

In sub-paragraphs (1) and (2), “damage” means, in the context of damage to flood defence capability or operation, any damage affecting the following—

(a)

the efficacy of flood defences;

(b)

the bed or banks of the river; or

(c)

the structure or operation of any outfall, flood or sea defences or any jetty or other structure under the jurisdiction of the Agency for the purposes of the Water Resources Act 1991f1.

(4)

For the purposes of sub-paragraphs (1) and (2)—

(a)

in the case of an accumulation, the remedy shall be its removal or such other protective works or measures as may be reasonably required by the Agency; and

(b)

in the case of erosion or alteration of tidal flow or littoral drift, the remedy shall be the carrying out of such reconstruction works and other protective works or measures as may be reasonably required by the Agency.

(5)

In the event that surveys, inspections, tests or sampling establish that such accumulation or erosion or alteration of tidal flow or littoral drift would have been caused in any event by factors other than the construction of a specified work, the Harbour Authority shall be liable to remedy such accumulation or erosion or alteration of tidal flow or littoral drift only to the extent that the same is attributable to a specified work.