Upon signifying his approval or disapproval of the plans the engineer may specify any protective works, whether temporary or permanent, which in his opinion should be carried out before the commencement of the construction of the specified works to ensure the stability of railway property, the continuation of the safe and effective operation of the railways of Railtrack PLC or the services of train operators using the same (including any relocation of works, apparatus and equipment necessitated by the specified works) and the comfort and safety of the passengers who may be affected by the specified works, and such protective works as may be reasonably necessary for those purposes shall be constructed by Railtrack PLC with all reasonable dispatch, or, if Railtrack PLC so desires, such protective works shall be carried out by the Company at its own expense and the Company shall not commence the construction of the specified works until the engineer has notified the Company that the protective works have been completed.

Annotations

Commencement

I1

Sch. 11 para. 8 in force at 9.11.2001, see art. 1

Notes on Schedule 11

Modifications

C1

Sch. 11 modified (31.12.2020) by The Railway (Licensing of Railway Undertakings) (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/700), regs. 1(2), 41; 2020 c. 1, Sch. 5 para. 1(1)