OpenLegislation

Schedule 4 STREETS TO BE STOPPED UPI1

England, Wales and Scotland

(1)(2)(3)(4)
AreaStreet to be stopped upExtent of stopping upNew street to be substituted
London borough of LewishamFootpath between Trundley’s Terrace and Oldfield Grove carried over the East London Line railway by means of a footbridgeWithin the limit of deviation for Work No. 7New footpath to be provided by means of a new footbridge (Work No. 7)
London borough of LewishamFootpath between Silwood Street and Rollins StreetBetween points F2, F3, F4, F5, F6, F8, F9 and F10, between points F6 and F7 and between points F9 and F11New footpath between points F2, F3, F4, F5, F19 and F20 and between points F21, F9 and F10

Annotations

Commencement

I1

Sch. 4 in force at 9.11.2001, see art. 1