Paragraph 58 I1
England, Wales and Scotland
In this Part of this Schedule—
-
“construction” includes execution, placing, relaying, renewal and works of maintenance and, in its application to a specified work which includes or comprises any operation, means the carrying out of that operation and “construct” and “constructed” have corresponding meanings;
-
“the PLA” means the Port of London Authority;
-
“plans” includes plans, sections, elevations, drawings, specifications and programmes and construction methods including, where applicable, such relevant hydraulic information about the River Thames as may be reasonably requested by the PLA; and
-
“specified work” means any authorised work, wherever situated, any part of which—
- (a)
is, or may be, in, on, under or over the surface of land below mean high water level forming part of the River Thames; or
- (b)
may affect the River Thames or any function of the PLA,
including any projection over the River Thames by any authorised work or any plant or machinery.
- (a)
Annotations
Commencement
- I1
Sch. 8 para. 58 in force at 15.12.2014, see art. 1