The Longfield Solar Farm (Correction) Order 2023
S.I. 2023/1241 · Made 20 November 2023
Infrastructure Planning
Made 20th November 2023
Coming into force 21st November 2023
In accordance with paragraph 1(5)(a) of Schedule 4 to the Act, before the end of the relevant period (as defined in paragraph 1(6)(a) of Schedule 4 to the Act), the Secretary of State received a written request from the applicantf3 for the correction of errors in the Order under paragraph 1(5)(a) of Schedule 4 to the Act.
In accordance with paragraph 1(7) of Schedule 4 to the Act, the Secretary of State has informed Braintree District Council and Chelmsford City Council as the relevant local planning authoritiesf4, that the request has been received.
The Secretary of State, in exercise of the powers conferred by section 119, and paragraphs 1(4) and 1(8) of Schedule 4 to the Act, makes the following Order—
Annotations to the whole text
Footnotes
- f1
- f2
-
2008 c. 29. Paragraph 1 of Schedule 4 was amended by paragraph 70 of Schedule 13, and Part 20 of Schedule 25, to the Localism Act 2011 (c. 20) and by paragraph 4 of Schedule 8 to the Marine and Coastal Access Act 2009 (c. 23). There are other amendments to the Act which are not relevant to this Order.
- f3
-
As defined in paragraph 4 of Schedule 4 to the Act.
- f4
-
As defined in paragraph 4 of Schedule 4 to the Act.
Contents
1Citation and commencement
This Order may be cited as the Longfield Solar Farm (Correction) Order 2023.
This Order comes into force on 21st November 2023.
2Corrections
The Longfield Solar Farm Order 2023 is corrected as set out in the table in the Schedule to this Order, in which—
column 1 sets out where the correction is to be made;
column 2 sets out how the correction is to be made; and
column 3 sets out the text which is to be substituted, inserted or omitted.
Signature
Signed by authority of the Secretary of State for Energy Security and Net Zero
John Wheadon
Head of Energy Infrastructure Planning Delivery
Department for Energy Security and Net Zero
20th November 2023
Corrections
| Column (1) Where the correction is made | Column (2) How the correction is made | Column (3) Text substituted, inserted or omitted |
|---|---|---|
| Article 14(2)(e) | For “amening” substitute | “amending” |
| Article 18(2) | For “article 25” substitute | “article 23” |
| Article 18(2) | For “Article 26” substitute | “article 26” |
| Article 21(3) | For “Itas” substitute | “as” |
| Article 25(5) | After sub-paragraph (4) insert |
|
| Schedule 2, Requirement 9(2)(a) | For “(or the current version of the metric if this has been superseded when the plan is submitted for approval)” substitute | “(or such other biodiversity metric approved by the relevant planning authority in consultation with the relevant statutory nature conservation body)”. |
| Schedule 10, heading | For “IMPOSTION” substitute | “IMPOSITION” |
| Schedule 13, row: “Bulls Lodge substation extension drainage strategy” | For “February 2022” substitute | “November 2021” |
| Schedule 13, row: “environmental statement volume 1: 6.1 (excluding chapters 2, 3, 7, 10, 14)” | Omit “3” | |
| Schedule 13 | Omit row “environmental statement volume 1: 6.1(B) (chapter 3), 2.0, September 2022” | |
| Schedule 13, row: “environmental statement volume 2: 6.2 (excluding appendices 2A, 7A, 9A, 10F, 13B)” | After “2A, 7A, 9A,” insert | “9D, ” |
| Schedule 13, row: “environmental statement volume 2: 6.2 (excluding appendices 2A, 7A, 9A, 10F, 13B)” | After “10F, 13B” insert | “, 13C” |
| Schedule 13 | After “environmental statement volume 2: 6.2(A) (appendices 9A, 10F)”, insert new row | “environmental statement volume 2: 6.2(B) (appendix 9D), 1.0, November 2021” |
| Schedule 13, row: “environmental statement volume 2: 6.2(C) (appendix 13B), 4.0, November 2022” | For “(C)”, “4.0”, “November 2022” substitute | “(B)”, “5.0”, “January 2023” |
| Schedule 13 | After “environmental statement volume 2: 6.2(B) (appendix 13B), 5.0, January 2023” insert new row | “environmental statement volume 2: 6.2(A) (appendix 13C), 2.0, October 2022” |
| Schedule 13, row: “environmental statement volume 3: 6.3 (excluding figures 2-3, 2-5, 2-27, 2-32, 10-13 (visualisations 4 and 5 of 5) and 10-15)” | After “environmental statement volume 3: 6.3 (excluding figures” omit | “2-3” |
| Schedule 13, row: “environmental statement volume 3: 6.3 (excluding figures 2-3, 2-5, 2-27, 2-32, 10-13 (visualisations 4 and 5 of 5) and 10-15)” | After “2-5, 2-27, 2-32,” insert | “10-10-2, 10-12, ” |
| Schedule 13 | Omit “environmental statement volume 3: 6.3(A) (figure 2-3)” | |
| Schedule 13 | After “environmental statement volume 3: 6.3(A) (figure 2-32)” insert | “environmental statement volume 3: 6.3(A) (figure 10-10-2), 2.0, October 2022” and “environmental statement volume 3: 6.3(A) (figure 10-12), 2.0, January 2023” |
| Schedule 13, row: “framework construction traffic management plan, Appendix 13B contained in the environmental statement (document reference 6.2(D)), 5.0, January 2023” | For “(D)” substitute | “(B)” |
| Schedule 13, row: “outline landscape and ecological management plan, 7.13(E), 6.0, January 2023” | For “(E)” substitute | “(D)” |
| Schedule 13, row: “outline operational environmental management plan, 7.11(C), 4.0, November 2022” | For “(C)” substitute | “(A)” |
| Schedule 15, Part 1, paragraph 2(a) | After “as defined in the Electricity Act 1989(a)”, insert | “)” |
| Schedule 15, Part 9, 107(1) | Omit “105(1)” |
Explanatory note
(This note is not part of the Order)
This Order corrects errors identified in the Longfield Solar Farm Order 2023, which granted development consent under the Planning Act 2008, following a request under paragraph 1(5)(a) of Schedule 4 to that Act.